L
L
$&66*)$
$&66*)$
$&66*)$
$&66+)$
$&66+)$
$&66.)$
$&66.)$
880
1204
1530
MODEL
L
3. Drilling the holes and attaching the suspension bolts
If using anchor bolts
(1) Drill holes for anchor bolts at the locations at which you will set the suspension bolts. Note that anchor bolts must be
obtained locally.
(2) Install the anchor bolts, then temporarily attach special nut "B" (included) and a locally-procured M10 nut to each of
the bolts.
Anchor-bolt strength: 980 to 1470 N (100 TO 150 kgf)
Ceiling panel
10 to 15 mm
Special nut A (included)
Special nut B (included)
M10 nut (Obtained locally)
(1) Drill 25mm holes at the suspension-bolt locations. The two special nuts are
provided with the unit. The M10 nut must be obtained locally.
(2) Install the bolts, then temporarily attach Special nuts A and B and a normal
M10 nut to each bolt.
Bolt strength: 980 to 1470 N (100 TO 150 kgf)
M10 Nut
(Obtaied locally)
10 to 15 mm
Special nut B(included)
M10 Nut (Obtaied locally)
25
Содержание AC105S2SH1FA
Страница 2: ......
Страница 14: ...14 ...
Страница 19: ...19 Troubleshooting ...
Страница 20: ...Troubleshooting 20 ...
Страница 31: ......