Commercial Air Conditioner
Model: heat pump, 10SEER UNITS
26
Fig.8-4
HORIZONTAL LEFT-HAND INSTRUCTIONS
Important: Read instructions below carefully.
Fig.8-5
1) With Air handler in the vertical position, remove all three access panels.
2) Remove J-shape metal bracket. Slide out from the Air handler cavity the "A" coil pan
assembly with horizontal drain pan on the right side. Remove oval gasket from horizontal
pan drain and also remove the plastic drain cover from the lower left access panel. Fig.
8-5
3) Relocate horizontal pan on the left-hand side of the "A" coil assembly.
4) Knockouts are located within the drain assemblies .Carefully remove only the correct
knockouts using a hammer and screw driver for each application, making sure the primary
and secondary drains are open and clear of burrs and debris. Remove secondary drain