3. PREPARATION FOR THE INSTALLATION
(1) Position of ceiling opening between unit and suspending bolt.
3
16
Distance between
suspending bolts 460mm
Overlap between ceiling and
ornament panel shall be 15mm
Suspending bolts
Ceiling
Ornament panel
(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)
(3) Install a suspending bolt.
(Use a M10 bolt)
To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new
ceiling, use built-in type bolt or parts prepared in the field.
Before going on installing adjust space between ceiling.
<Installation example>
Note: All the above mentioned parts shall be prepared in field.
Ceiling
50~100
Roof
Anchor bolt
Long nut
Suspending bolt
Refer to paper pattern for dimension of ceiling hole.
Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation.
Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration.
Contact your real estate dealer
630(Ornament panel)
600(Ceiling opening)
570(Indoor unit)
630(Ornament panel)
600(Ceiling opening)
570(Indoor unit)
Installation Procedure
Содержание AB092FCAHA
Страница 21: ......