5. Mounting and in-
stallation
5.1 Requirements for installation locations
• Ambient conditions must be followed; see section " Ambient conditions during
operation" on page
• Connection leads for connecting the various components must be present.
• The voltage of the on site power supply must meet the requirements of the pow-
er supply unit used. See operating instructions of the power supply unit.
• Cable thickness of the on site power supply: 1.5 mm
5.2 Mounting and installation of the EC energy control terminal
• Personnel: qualified electrician
Prerequisites
• At the desired installation location, a switch box according to British standard is
pre-installed in the wall.
• The cable for the power supply and the cable to the electric strike are already
installed.
» Disconnect voltage supply from the mains.
Installation
NOTE!
Risk of damage to the cables!
Carefully push the terminal module and cable into the switch box. Ensure
that the cables are not trapped.