25
H
D
E
1
1
/2
018
73
2.2
9
.1
28
1. Notes on these
installation and maintenance instructions
These installation and maintenance instructions aid in the secure mounting and
installation of the WT 210 wall terminal as a component of an access control system.
The instructions are a constituent of the system, and must be kept in the immediate
vicinity of the system and be accessible to the personnel at all times.
The personnel must read and understand these instructions carefully before starting
any work. A basic requirement for safe work is the observance of all safety notes
and handling indications specified in these instructions.
Furthermore, the local health and safety regulations and general
safety regulations for the area of application of the system apply.
Associated documents
In addition to these installation and maintenance instructions, the following
documents are valid for the access control system:
• Supplier documentation of the power supply
• Dialock 2.0 user manual or updated version
1.1 Contents and
target group of
the installation
and maintenance
instructions
It is essential to pay attention to these installation and maintenance instructions in
order to install the product successfully and safely. Please pay attention to all of
the specified installation steps, instructions and notes!
These
installation and maintenance instructions
are intended for:
• the
operator
of the product
• the
installer
of the product
In addition to these installation and maintenance instructions, both groups of people
must also have read
the separate operating instructions
and
the
DIALOCK
software manual
before handling the product.
In case of use in software-controlled systems, separate instructions are enclosed
with the relevant system components.
1.2 Obligations of
the installer
The installer has the following obligations:
• All notes and specifications in the installation and maintenance instructions must
be complied with. The installation steps must not be deviated from or varied.
• Only the supplied original parts must be installed.
• The installation and maintenance instructions must be handed to the operator
after installation has taken place.
1.3 Obligations of
the operator
The operator has the following obligations:
• The installation requirements must be adhered to.
• The product may only be installed and started up by qualified experts.
• The installation and maintenance instructions must be kept until the product is
disposed of, and handed to the new operator in the event of a change of
operator.
1.4 Exclusion of
liability
No liability is accepted for injuries or damage that is attributable to one or more of
the following reasons:
• abuse of the equipment
• omission of the emergency opening facility
• failure to read and/or follow the instructions
• inadequately qualified / instructed personnel,
• negligent handling of the product
Installation and maintenance instructions - English
ins-src-732.29.128.book Seite 25 Dienstag, 20. November 2018 10:27 10
Содержание WT 210
Страница 23: ...23 HDE 11 2018 732 29 128 ins src 732 29 128 book Seite 23 Dienstag 20 November 2018 10 27 10 ...
Страница 89: ...89 HDE 11 2018 732 29 128 ins src 732 29 128 book Seite 89 Dienstag 20 November 2018 10 27 10 ...
Страница 111: ...111 HDE 11 2018 732 29 128 ins src 732 29 128 book Seite 111 Dienstag 20 November 2018 10 27 10 ...