4.4 SITE PREPARATION
When selecting the site for the machine, consider the largest size of workpiece that will be
processed through the machine and provide enough space around the machine for operating
the machine safely. Consideration should be given to the installation of auxiliary equipment.
Leave enough space around the machine to open or remove doors/covers as required for the
maintenance and service as described in this manual.
It is recommended that the machine is anchored to the floor to prevent tipping or shifting. It
also reduces vibration that may occur during operation.
4.5 LIFTING INSTRUCTIONS
On the day that the machine arrives, make sure that a
forklift or lifting device, with sufficient capacity is avail-
able to unload the machine from the vehicle. Ensure
access to the chosen site is clear and that doors and
ceilings are sufficiently high and wide enough to receive
the machine.
This machine is extremely heavy.
Serious personal injury may occur if safe moving methods are not
followed. To be safe, you will need assistance and power equip-
ment when moving the shipping crate and removing the machine
from the crate.
When lifting the machine only certified lifting slings
should be used.
Hitch a web sling between the motor and the spindle.
Ensure that when lifting, the machine does not tip over.
Check that the lifting slings do not interfere with the
parts of the machine that may be damaged. (Fig.2.1)
NOTE: When lifting a heavy load it is important that
you have determined the centre of gravity before you
begin lifting. Determining the centre of gravity is vital to
achieving total control over the load.
LIFTING POINT
F
ig
. 4.2