10-8
Shroud and Base Assemblies
P/N 108755-US, Manual revision: AA
S
HROUD
A
SSEMBLY
I
NSTALLATION
1.
To assemble the shroud assembly to the base, rotate the link assembly un-
til the Link D is in its highest position.
2.
Lay the Shaker in a cradle with the bottom of the Shaker facing up.
3.
Loosen the screws on the rear boss inside the shroud and slide it onto the
link until the shaft in the Link D slides into the grooves in the rear boss of
the shroud and behind the cone screw/washers. Using a long screwdriver,
tighten the rear boss screws.
4.
Apply a small amount of grease in the center of the female knife.
5.
Position the female knife over the knife edge.
6.
Place screws into the holes on each end of the female knife.
7.
Bring the shroud up to the female knife, aligning screws with boss.
8.
Through the bottom of the base, hold one screw in place with a long phil-
lips screwdriver and start the screw.
9.
After beginning one screw, start on the other one and then tighten both.
Содержание SEBRA 1040
Страница 1: ...108755 US service manual Model 1040 Digital Blood Shaker...
Страница 3: ......
Страница 4: ...Printed in USA Copyright 1999 2010 Haemonetics Corporation...
Страница 8: ...vi Preface P N 108755 US Manual revision AA...
Страница 12: ...x Table of Contents P N 108755 US Manual revision AA...
Страница 14: ...xii List of Figures P N 108755 US Manual revision AA...
Страница 20: ...1 6 Introduction P N 108755 US Manual revision AA...
Страница 36: ...3 10 Inspection Procedures P N 108755 US Manual revision AA...
Страница 37: ...P N 108755 US Manual revision AA Chapter 4 Parts Access BASE PLATE REMOVAL 4 2 SHROUD REMOVAL 4 3...
Страница 40: ...4 4 Parts Access P N 108755 US Manual revision AA...
Страница 48: ...5 8 Strain Gauge P N 108755 US Manual revision AA...
Страница 60: ...7 6 Tube Clamp Assembly P N 108755 US Manual revision AA...
Страница 64: ...8 4 PCB Chassis Assembly Installation P N 108755 US Manual revision AA...
Страница 83: ...P N 108755 US Manual revision AA Chapter 11 Clamp Body Boss Replacement REPLACING THE BODY BOSS 11 2...
Страница 86: ...11 4 Clamp Body Boss Replacement P N 108755 US Manual revision AA...
Страница 98: ...13 8 Cap Assembly P N 108755 US Manual revision AA...
Страница 102: ...14 4 Power Supply P N 108755 US Manual revision AA...
Страница 103: ...P N 108755 US Manual revision AA Chapter 15 Shaker Keystroke Quick Reference KEYSTROKE QUICK REFERENCE 15 2...
Страница 105: ......
Страница 106: ...Haemonetics Corporation 400 Wood Road Braintree MA 02184 USA www haemonetics com 1995 2010 Haemonetics Corporation...