background image

 

 

 Information 

 

  

5.52.210.00.01.01

 

1 Information 

 

Pos: 6.2.1 /1--INFORMATION/Allgemein/*Information*/01.Information @ 0\mod_1176734820982_52.doc @ 4653 @  @ 1 

 

HADEF products meet European Union requirements, in particular the EU Machine Directive (2006/42/EG). 
The entire company works acc. to a certified quality assurance system as per ISO 9001. 
The production of components at HADEF is subject to strict, intermediate checks. 
After assembly, each HADEF product is subject to a final test with overload. 
For the operation of hoists, the accident prevention regulations BGV D8, BGV D6 and BGR 500 apply in 
Germany, amongst others. 
The stated performance of the devices and meeting any warranty claims require adherence to all instructions 
in this manual. 
Before delivery, all HADEF products are packed properly. Check the goods after receipt for any damage 
caused during transport. Report any damage immediately to the forwarding agent. 
This manual allows a safe and efficiently use of equipment. Images of this manual are for a principle 
understanding and can be different from the real design. 
 

Pos: 6.2.2 /---ALLGEMEIN/Hinweise/Prüfungen/HINWEIS - Vorgeschriebene Prüfungen @ 0\mod_1174472067892_52.doc @ 821 @  @ 1 

 

NOTE!

 

We refer to the prescribed equipment tests before initial start-up, before putting back into 
operation and the regular periodic inspections. 
In other countries any additional national regulations must be observed. 
 

Pos: 7.1 /2--SICHERHEIT/*Ü1*/#. Kapitel - Sicherheit @ 0\mod_1172054959462_52.doc @ 172 @  @ 1 

 

Содержание DIN 7355

Страница 1: ...Jack DIN 7355 Pos 1 4 TITELSEITE Bauarten leer Standard 0 mod_1172062835772_52 doc 201 1 Pos 1 5 TITELSEITE Bauarten leer Standard 0 mod_1172062835772_52 doc 201 1 Pos 1 6 TITELSEITE Bauarten leer St...

Страница 2: ...tscher Sprache Translation of the original operating and maintenance instructions Eine Kopie kann bei HADEF schriftlich angefordert werden A copy is available from HADEF on request nderungen vorbehalt...

Страница 3: ...1 2 Inspection intervals 16 12 Service 17 12 1 Gear 17 12 2 Safety crank and load pressure brake 17 12 3 Lubricant selection 17 13 Trouble 18 14 Remedy 19 15 Decommissioning 20 15 1 Temporary decommis...

Страница 4: ...he devices and meeting any warranty claims require adherence to all instructions in this manual Before delivery all HADEF products are packed properly Check the goods after receipt for any damage caus...

Страница 5: ...ponsible for this However in everyday operation this degree of safety can only be achieved if all measures required are taken It falls within the duty of care of the owner user of the devices to plan...

Страница 6: ...Defective devices and load suspension devices must not be used until they have been repaired Only original HADEF spare parts must be used Non compliance will result in any warranty claims on HADEF bec...

Страница 7: ...ks of all main components such as chains load hooks etc and replace any damaged parts with new original spare parts before putting the equipment back into operation Do not use a hoist that is defectiv...

Страница 8: ...94 1 3 1 Transport HADEF devices are checked and if so adequately packed before delivery Do not throw or drop the equipment Use adequate means of transport Transport and means of transport must be sui...

Страница 9: ...er load vertically with small lifting heights or horizontally and tilt angle as supporting winch The load must always be in right angle 90 to the winch foot surface Optional with a safety crank or a r...

Страница 10: ...3000 350 250 8 20 5000 300 250 4 27 10000 300 500 4 42 Pos 10 3 5 TECHNISCHE DATEN Winde Seilzug 7355 2 7355 Ma e 1 mod_1266830691652_52 doc 12727 1 5 1 Main dimensions dimensions mm 1500 kg 3000 kg 5...

Страница 11: ...made stress free use shim parts if necessary The winch must be set up and attached in such a way that it cannot change position neither by the load nor by other influences Pos 11 2 2 6 MONTAGE Winde S...

Страница 12: ...ad turn clockwise Hold load release hand crank The load holds automatically Acc The different types the crank can removed in each position or the crank grip can fold back Lowering load turn anti clock...

Страница 13: ...t i e lifting and trolley movement must be tested by a licensed quality person before putting in operation An exception is hoists ready for operation acc To BGV D6 II 25 4 with EU declaration of confo...

Страница 14: ...onspr fung 260 76 7355 1 mod_1266325114963_52 doc 12314 1 Function must be tested with capacity load which is shown on the type plate Test brake by lifting and lowering the load The load must be hold...

Страница 15: ...be done when the hoist is not loaded Records must be kept of all test results and measures taken Pos 15 2 2 12 INSTANDSETZUNG Allgemein 02 berwachung 0 mod_1173254503420_52 doc 472 1 10 2 Monitoring T...

Страница 16: ...nd the national safety regulations apply Pos 16 3 1 13 PR FUNG Winde Seilzug 01 Tabelle Inspektionsintervalle 7355 1 mod_1266825976021_52 doc 12699 1 11 2 Inspection intervals on commissioning daily c...

Страница 17: ...ved out in uncharged condition The bearing points can be lubricated with some drops of oil when the winch is placed down on its side This makes it possible that the lubricant penetrates between the be...

Страница 18: ...ing area of moving parts of the unit Please read the chapter Safety instructions Notes on the repair of faults are found in the following table For the repair of failures please contact our service de...

Страница 19: ...d is not lifted or it is difficult to lift the load Brake discs are humid or oiled The winch or the crank must be repaired by the manufac turer The load pressure brake does not open Brake mechanism or...

Страница 20: ...g the machine are carried out in the indicated sequence First secure the working area for decommissioning leaving plenty of space Read the chapter Safety instructions Disassembly is carried out in rev...

Отзывы: