Inspection 

 

 

5.52.291.00.01.01  

 27

 

13 Inspection 

 

Pos: 17.2 /1_HADEF/13-PRÜFUNG/Wiederkehrende Prüfung/00.GÜ (nur motorische Geräte) @ 2\mod_1276587258148_52.docx @ 14490 @  @ 1 

 

13.1 

General Overhaul for motor-driven units 

The accident prevention regulations BGV D8 must be observed and the measures to reach "safe working 
periods (S.W.P.)" according to FEM 9.755. 
After the "theoretical working time D" has been elapsed, the owner/user must take motor driven devices out 
of operation and effect a General Overhaul. 
Further use of the equipment is only allowed after a licensed qualified person has proofed  

  that further use is possible without doubt 

and 

  the conditions for further use have been determined 

These conditions have to be written down in the test book. 

The owner/user is responsible to make sure that these conditions are observed. 

Pos: 17.3 /1_HADEF/13-PRÜFUNG/Wiederkehrende Prüfung/01.Wiederkehrende Prüfung @ 0\mod_1175675257580_52.docx @ 3164 @  @ 1 

 

13.2 Periodic 

checks 

Independently from the regulations of the individual countries, lifting devices must be checked at least yearly 
by a qualified person or licensed qualified person regarding its functional safety.  
In Germany it is necessary to observe the accident prevention regulations BGV D6, BGV D8, BGR 500 as 
well as DIN 15020 (Basics for cable drives). In other countries, the above mentioned tests and the national 
safety regulations apply.  

Pos: 17.4.1 /1_HADEF/13-PRÜFUNG/Winde+Seilzug/01.Drahtseil @ 0\mod_1175675766898_52.docx @ 3179 @  @ 1 

 

13.3 Wire 

rope 

Adequate performance of the servicing and monitoring work acc. to DIN 15020 page 2 “Basics for cable 
drives – monitoring during use”. 
A visual check must be effected before every new work shift. 

 Wear 

 Deformation 

 Fissures 

 Corrosion 

Report any damage immediately to the responsible person and exchange damaged or worn wire ropes and 
load tackles. 

 

Pos: 17.4.2 /1_HADEF/13-PRÜFUNG/Winde+Seilzug/02.Tabelle-Inspektionsintervalle - Teil 1 - Alle  @ 0\mod_1175676662604_52.docx @ 3192 @  @ 1 

 

13.4 Inspection 

intervals 

 

on commissioning 

daily checks 

1st service after 3 

months 

inspection, service 

every 3 months 

inspection, 

service every 12 

months 

Inspection of the equipment by a qualified person (periodic 

inspection) 

   

 

Check screw connections 

 

 

 

Check brake function 

 

 

 

check brake air gap (only for electric devices) *) 

 

 

 

 

check overload protection if existent 

 

 

 

 

clean and lubricate the wire rope 

 

 

check wire rope and wire rope end fastenings for damage 

and wear 

 

 

X   

 

check the load tackle and load hook for cracks and 

deformation 

 

 

 

 

 

 

*) not for EX design 

Pos: 17.4.3 /1_HADEF/13-PRÜFUNG/Winde+Seilzug/02.Tabelle-Inspektionsintervalle - Teil 2 - 42/87 @ 1\mod_1245910539934_52.docx @ 11130 @  @ 1 

 

check oil level of the lifting gear 

 

 

 

 

 

lifting 

gear, 

oil 

change 

     

*) 

Chain drive - the roller chain must be oiled 

each month *) 

Chain drive - the roller chain must be checked 

 

 

 

 

 

*) see chapter "maintenance" 

 

Pos: 17.4.4 /1_HADEF/13-PRÜFUNG/Winde+Seilzug/03. Kettenantrieb-Rollenkette-Verschleiß @ 2\mod_1292579364804_52.docx @ 17854 @  @ 1 

 

 

 

Содержание 42/87P

Страница 1: ...mein HADEF Bezeichnung 0 mod_1171289923124_0 docx 69 1 HADEF Pneumatic Wire Rope Winch Type 42 87P Pos 1 4 1_HADEF TITELSEITE Sonderausf hrungen leer Standard 0 mod_1172063198918_52 docx 206 1 Pos 1 5...

Страница 2: ...n www hadef com Subject to changes Pos 4 1_HADEF ALLGEMEIN Allgemein 4 Inhaltsverzeichnis Inhaltsverzeichnis 1 2 0 mod_1171286846268_52 docx 56 1 Table of Contents 1 Information 4 1 1 Indications to d...

Страница 3: ...ck rope switch as option 25 13 Inspection 27 13 1 General Overhaul for motor driven units 27 13 2 Periodic checks 27 13 3 Wire rope 27 13 4 Inspection intervals 27 13 5 Roller chain 28 13 6 Chain whee...

Страница 4: ...efore initial start up before putting back into operation and the regular periodic inspections In other countries any additional national regulations must be observed Pos 5 3 1 1_HADEF 1 INFORMATION A...

Страница 5: ...ponsible for this However in everyday operation this degree of safety can only be achieved if all measures required are taken It falls within the duty of care of the owner user of the devices to plan...

Страница 6: ...al spare parts must be used Non compliance will result in any warranty claims becoming void Liability and warranty will become void if unauthorized modifications of the units are made by the user Pos...

Страница 7: ...motion any persons in the immediate vicinity must be informed by calling to them Please pay attention to the regulations for load carrying devices UVV BGR500 for both positive and non positive methods...

Страница 8: ...ocx 194 1 3 1 Transport The devices are checked and if so adequately packed before delivery Do not throw or drop the equipment Use adequate means of transport Transport and means of transport must be...

Страница 9: ...CHREIBUNG Winde Seilzug Aufbau Aufbau 42 87P 2 mod_1286871744710_52 docx 16050 1 4 2 Design HADEF pneumatic wire rope winches for stationary use are fitted with holes for installation The housing is m...

Страница 10: ...must be pulled by hand and hold until the hand lever has moved some steps It engages automatically after the switch operation has ended When the clutch is disengaged it is possible to pull the uncharg...

Страница 11: ...28 22 41 6 20 1 8 3 3 R 3 4 94 84 75 2309 990 650 30 25 151 145 4 10 17 1 5 27 9 40 1 8 3 3 R 3 4 94 84 160 2409 1000 650 30 25 151 145 4 10 17 12 5 27 9 40 1 8 3 3 R 3 4 94 84 160 3405 2000 1400 36 3...

Страница 12: ...Seilzug Drahtseil Allgmein 03 2 Seilauswahl Alle Seil nach EN 2 mod_1283498365267_52 docx 15534 1 Wire ropes acc to EN 12385 4 Lifting ropes Pos 10 2 3 1 3 1_HADEF 6 MONTAGE Winde Seilzug Drahtseil A...

Страница 13: ...diameter Pos 10 2 3 4 2 1_HADEF ALLGEMEIN Hinweise Winden HINWEIS 2 Wicklungen auf Trommel 0 mod_1177330646284_52 docx 5254 1 NOTICE According to DIN 15020 regulations and to the accident prevention...

Страница 14: ...5 4 5105 5106 6 1 6105 8 1 7104 8 8 Pos 10 3 1_HADEF 6 MONTAGE Werkzeuge 42 87P 2 mod_1294231644340_52 docx 17947 1 6 6 Tools Pos 10 4 1_HADEF 6 MONTAGE Schraubentabellen Anzugsmomente M6 M33 2 mod_1...

Страница 15: ...g moment Nm in property class 8 8 10 9 M 6 10 4 15 3 M 8 25 3 37 2 M 10 51 75 M 12 87 128 M 14 139 205 M 16 214 314 M 18 280 390 M 20 431 615 M 22 530 750 M 24 742 1159 M 27 1000 1400 M 30 1350 1900 M...

Страница 16: ...t 1 Feinf Direktsteuerung 1 mod_1185779780952_52 docx 7388 1 Direct control 1 Emergency Stop 2 Lifting 3 Lowering Illustration 6 Pos 11 4 2 1_HADEF 7 BEDIENUNG Druckluft 2 Indirekte Druckluftsteuerung...

Страница 17: ...llustration 11 Engaging Pull out the locking button 1 again and hold the disengaging lever 2 against spring tension Move the drum by hand and therewith let the coupling engage again automatically Let...

Страница 18: ...ance intervals must be adhered to Pos 12 2 2 1_HADEF ALLGEMEIN Hinweise GEFAHR Losrei en Personentr schweb Lasten ex verboten E P 0 mod_1176799462104_52 docx 4735 1 DANGER It is not allowed pulling lo...

Страница 19: ...thorities Z S Pos 13 2 2 1_HADEF 9 INBETRIEBNAHME Allgemein Druckluftanschluss Alle 1 mod_1185782523360_52 docx 7441 1 9 2 Compressed air connection Before commencing work on the equipment the main ai...

Страница 20: ...ication shortens the lifetime of the wire rope and the maintenance intervals Pos 13 2 5 2 1_HADEF ALLGEMEIN Hinweise Seile WARNUNG Kunststoffseile verboten 0 mod_1177329455688_52 docx 5225 1 WARNING I...

Страница 21: ...fully be actuated by hand The switch can also be taken out of service by dismantling the eccentric disc The slack rope switch will be installed in our factory according to customer s requirements Inst...

Страница 22: ...htened and secured Pos 14 3 1_HADEF 10 SICHERHEITSPR FUNG Allgemein 02 Sicherheitspr fung Zusatz E P 0 mod_1178197432766_52 docx 5694 1 The oil levels in the gear boxes are sufficient All movements of...

Страница 23: ...r fung E P Winde 0 mod_1175670932680_52 docx 3115 1 11 1 Checks before the initial start up Check lifting by moving up down and slow fast without load Suspend the nominal load and check the function o...

Страница 24: ...ed correspondingly Pos 16 3 1 1 1_HADEF 12 INSTANDSETZUNG Druckluftmotor Tabellen Tabelle alle 1 mod_1193146811619_52 docx 8142 1 12 3 Pneumatic motor The thickness of the brake lining must be checked...

Страница 25: ...llung 1 mod_1245934776622_52 docx 11209 1 12 6 Slack rope switch as option 12 6 1 Adjustment Illustration horizontally Other versions are possible Insert the wire rope 1 under the guiding pulley 4 and...

Страница 26: ...tting is necessary if the wire rope exit exceeds 45 Release the screw 1 slightly Turn the square 2 until the roller puts pressure on the wire rope Hold the square 2 and tighten the screw 1 again Illus...

Страница 27: ...apply Pos 17 4 1 1_HADEF 13 PR FUNG Winde Seilzug 01 Drahtseil 0 mod_1175675766898_52 docx 3179 1 13 3 Wire rope Adequate performance of the servicing and monitoring work acc to DIN 15020 page 2 Basic...

Страница 28: ...ign again straight after going round the chain wheel Illustration 21 Marks of impact or other deformation wear of the holes of the roller plates Illustration 22 broken plates broken bushes Illustratio...

Страница 29: ...en one strand be broken Pos 18 2 2 1_HADEF 14 WARTUNG Winde Seilzug Getriebe 03 Getriebe 42 45 Teil 1 1 mod_1245911765789_52 docx 11151 1 14 2 Gear The gears need low maintenance The maintenance is re...

Страница 30: ...inch during lubrication Pos 18 2 5 1_HADEF 14 WARTUNG Winde Seilzug Kettenantrieb Rollenkette Schmierung 2 mod_1292508430800_52 docx 17841 1 The roller chain must always have a film of lubricant and m...

Страница 31: ...hmierung 2 mod_1278592187864_52 docx 14710 1 Pos 18 3 3 1_HADEF 14 WARTUNG D Motor Wartungseinheit Schmierung 2 mod_1278592630216_52 docx 14714 1 Use Recommendation Interval Maintenance unit FUCHS REN...

Страница 32: ...rea of moving parts of the unit Please read the chapter Safety instructions Notes on the repair of faults are found in the following table For the repair of failures please contact our service departm...

Страница 33: ...to mains supply After prolonged standstill see maintenance of the pneumatic motor Motor runs load is not lifted pressure reducing valve overload reduce the load to nominal load pressure reducing valv...

Страница 34: ...out in the indicated sequence First secure the working area for decommissioning leaving plenty of space Read the chapter Safety instructions Disassembly is carried out in reverse order to the assembl...

Страница 35: ...Additional documents Pos 22 2 1_HADEF 18 BEISTELLUNG Druckluft Druckluft 1 mod_1185789921757_52 docx 7538 1 18 1 Pneumatic connections diagram The pneumatic connections diagram is attached to the con...

Отзывы: