6.4 Tools 

 

 
 
 
 

 

 

 

 

 

 

 

7 Operation 

 

Only people that are familiar with the operation of the lifting devices and cranes may be entrusted with their 
operation. They must be authorized by the employer for the operation of the equipment. The employer must 
ensure that the operating instructions are available near the equipment and that they are accessible for the 
operating personnel.  

 

Monorail push travel trolleys are moved by pushing the load. 
Monorail hand geared trolleys are moved by pulling the hand chain. 

 

 

 

7.1 General 

Should the unit be used in Germany:  
Please observe the validated, national accident prevention regulations. 
For other countries:  
Inspections as above. Please observe the national rules and regulations and the instructions in this manual! 

 

 

 

NOTICE!

 

Hoists up to 1000 kg capacity and without motor-driven trolleys of hoisting unit must be tested by a “qualified 
person” before putting into operation for the first time. 
Hoists of 1000 kg capacity and up or with more than one motor-driven hoist movement; i.e. lifting and trolley 
movement, must be tested by a “licensed qualified person” before putting in operation. 
An exception is “hoists ready for operation” acc. validated national regulations with EU-declaration of 
conformity. 

Definition “qualified person” (former expert) 

A “qualified person” has learned, due to occupational training and experience and the job that the person has 
done, the skills needed to tests the material for one’s work. 

Definition “licensed qualified person” (former approved expert) 

A “licensed qualified person” has, due through special occupational training, knowledge about testing of the 
material for one’s work and knows the national accident prevention regulations and other prescriptions and 
technical regulations. This person must test the material for one’s work regularly with regard to design and 
kind of use. The license will be given to qualified person be the approved supervision authorities (ZÜS). 

 

8 Safety 

check 

 

 

Before putting into service initially or when putting back into service, it must be checked whether: 

ƒ

  All fastening screws (if existent), socket pins, flap socket and safety devices are tightened and secured. 

 

9 Functional 

test 

 

 

9.1 

Checks before the initial start-up 

Trolley drive 

ƒ

  The open-lying teeth of the trolley drive must be lubricated. 

Hand gear for hand geared trolley 

ƒ

  Ensure correct fit of the hand chain; it must not be twisted and must hang freely. 

 
 

 

 

18/16R-VA 

500kg = SW30 

1000kg = SW35

 

18/16H-VA 

1000kg = SW55 
2000kg = SW55 
3000kg = SW65 

Содержание 18/16R-VA

Страница 1: ...5 52 122 00 01 02 Rev 02 HADEF Monorail Trolley Type 18 16VA as push travel trolley R as hand geared trolley H Stainless steel design Installation Operating and Maintenance Instructions...

Страница 2: ...nges Table of Contents 1 Information 3 2 Safety 3 2 1 Warning notice and symbols 3 2 2 Duty of care of the owner 4 2 3 Requirements for the operating personnel 4 2 4 Appropriate use 5 2 5 Basic safety...

Страница 3: ...packed properly Check the goods after receipt for any damage caused during transport Report any damage immediately to the forwarding agent This manual allows a safe and efficiently use of equipment Im...

Страница 4: ...lt free fully functional condition and the safety components in particular are checked regularly to ensure that it is functioning properly The required personal protective equipment for the operators...

Страница 5: ...re for a free view on the load Only use the hoists appropriately The equipment is to be used exclusively for movement of goods Under no circumstances my persons be moved Never load the devices beyond...

Страница 6: ...gainst corrosion 4 Description 4 1 Areas of application The devices must be as far as possible installed in a covered room If they are used in the open protect the units against the effects of weather...

Страница 7: ...ion depends on the local environment The hoist must be suspended in a way that it can position itself freely 6 1 Trolley For assembly on a beam a travel limit must be placed at either end of the track...

Страница 8: ...the trolley onto the beam flange from below Push the trolley together again until it reaches the correct wheel gauge Secure the washers and distance tubes by tightening the hexagon nuts and the safet...

Страница 9: ...is hoists ready for operation acc validated national regulations with EU declaration of conformity Definition qualified person former expert A qualified person has learned due to occupational trainin...

Страница 10: ...ified person regarding its functional safety at commissioning daily checks 1st maintenance after 3 months Inspection Maintenance every 3 months Inspection Maintenance every 12 months check screw conne...

Страница 11: ...re parts 14 Decommissioning WARNING It is essential that the following points are observed in order to prevent damage to the equipment or critical injury when the device is being decommissioned It is...

Отзывы: