Another section has been
added to the hull. The first
two torpedoes have been
assembled and inserted
into torpedo tubes 1 and 3.
Place the upper port (L) hull section
10-1
on your work surface.
Take connector
10-2
and fi t it onto the two right-hand raised screw
sockets on the interior of the hull, as shown.
Take the main hull assembly and fi t the new section
10-1
onto the
port (L) side of the structure. Attach connectors
10-2
and
10-3
to
connectors
6-2
and
8-2
using a
CP
screw in each.
Fix connector
10-2
in place using two
AM
screws.
1
4
2
STAGE 2
Adding the hull section
COMPLETED WORK
Place connector
10-3
on the hull section
10-1
, aligning the holes of
the two parts. Fix together using two
AM
screws.
3
10-1
10-2
10-2
10-1
AM
10-3
10-1
AM
10-1
10-3
10-2
CP
CP
8-2
6-2
Parts reference list
Part no.
Name
11-1
Torpedo tube 2
11-2
Torpedo tube 4
11-3
Pipes L (1, 2, 3, 4, 5)
11-4
Torpedo tube parts L (A, B, C, D)
11-5
Hatches (1, 2, 3, 4)
11-6
Torpedo tube parts (2 x E, F)
11-7
Torpedo tube parts (2 x G, H, I, 2 x J, K, L)
11-8
Torpedo tube parts (M, N, O, 2 x P, 2 x Q)
11-9
Ejection cartridges (R, S)
Kit 10:
Two torpedoes
3
1
Kit 11:
Two more torpedo tubes
After various details are attached to torpedo tubes 2 and 4, the two are joined together
and five pipes attached. Lower hatches are attached to all four bow tubes.
Note:
Most of the steps in this kit are
similar to those in kit 9, so there is less
detail in the instructions here; only the last
three steps are ‘new’. Refer back to
kit 9’s instructions if you need any
additional detail.
11-1
A
B
C
D
E
F
G H I
J
K
L
M N O P
Q
R
S
11-2
11-3
11-4
11-5
11-6
11-7
11-8
11-9
PACK_3 _UK.indd 12-13
02/08/2023 15:39