background image

21

Section 3

Maintenance

There are no scheduled maintenance requirements for the 
instrument. To ensure reliable and precise operation, it must be 
kept clean. 

3.1 Cleaning the Instrument

DANGER

 

Strong acids and 
bases can cause 
burns. 

1.

Switch off the instrument, unplug the power cord and allow 
the instrument to cool.

2.

Wipe the instrument with a soft, damp cloth. Make sure no 
water penetrates into the instrument. 

If a vial overflows or breaks, or a small amount of liquid is 
spilled, proceed as follows: 

1.

Switch off the instrument, unplug the power cord and allow 
the instrument to cool.

2.

Draw off the liquid with a pipette, avoiding any contact with 
the skin. 

3.

Transfer liquid residues to a proper disposal. 

4.

Remove broken glass with tweezers and wipe out any 
remaining liquid, avoiding any contact with the skin. 

3.2 Instrument Test

The temperature shown in the display corresponds to the 
temperature in a closed HACH vial filled with an aqueous 
medium. During the heating phase, the real block temperature in 
the vicinity of the heater may be higher than the temperature 
shown on the display. 

An empty Hach vial, glycerol (approximately 5 mL), and a 
calibration stem-type thermometer (95–155 °C) are needed to 
check the block temperature.

Содержание DRB 200

Страница 1: ...DOC022 53 00619MAI04 Digital Reactor Block 200 DRB 200 Instrument Manual Hach Company 2003 All rights reserved Printed in Germany eac dk 5 04 4ed...

Страница 2: ...2...

Страница 3: ...2 Routine Operation 16 2 3 Using the Reducing Adapters 17 2 4 Selecting the Program 17 2 5 Setting User Programs 19 2 6 Error Messages 19 Section 3 Maintenance 21 3 1 Cleaning the Instrument 21 3 2 In...

Страница 4: ...4...

Страница 5: ...imminently hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a potentially hazardous situation that may result in minor or moderate injury NOTE Inform...

Страница 6: ...d area thoroughly with water Avoid breathing released vapors Read the Material Safety Data Sheets MSDS supplied with each reagent for complete chemical information Fire Hazard Avoid the presence of fl...

Страница 7: ...120 minutes 105 C program 105 C 30 60 120 minutes 150 C program 150 C 30 60 120 minutes 165 C program 165 C 30 60 120 minutes Easily selected 37 165 C no cooling Programmable Temperature Range 37 165...

Страница 8: ...8...

Страница 9: ...The DRB 200 has 6 stored and 3 programmable temperature programs Figure 1 Front View of the DRB 200 Digital Reactor Block 2 Block Version 1 1 Front Display The instrument is operated using three touc...

Страница 10: ...10 Introduction Figure 2 DRB 200 Display and Keys 1 Display 2 Touch sensitive Keys 1 2...

Страница 11: ...11 Introduction Figure 3 Menu Structure...

Страница 12: ...12...

Страница 13: ...Dem fortrolig med alle sikkerhedsforholdsregler inden De omg s kemikalier af nogen art GEFAHR Das Arbeiten mit chemischen Proben Standards und Reagenzien ist mit Gefahren verbunden Es wird dem Benutze...

Страница 14: ...14...

Страница 15: ...tching the power switch Figure 4 4 After initialization the instrument will beep once indicating that it is ready for operation The display always shows the most recent setting of the temperature prog...

Страница 16: ...eration 1 Switch on the instrument 2 Select the required temperature program using the appropriate keys see section 2 4 on page 17 3 Prepare the test vials as described in the analysis procedure 4 The...

Страница 17: ...block with 20 mm diameter holes insert the reducing adapters into the holes to reduce the diameter to fit the 16 mm tubes 2 4 Selecting the Program The temperature programs can be selected independent...

Страница 18: ...ial tests 100 C Program Heats vials for 30 60 or 120 minutes at 100 C For example the 100 C 60 minutes setting is needed to digest samples using the Methods Prep Set 105 C Program Heats vials for 30 6...

Страница 19: ...ess OK to confirm the entry 6 Press OK to confirm the program The program can be changed by pressing Prog Press the up arrow key to return to the program selection screen 2 6 Error Messages 165 C Prog...

Страница 20: ...20...

Страница 21: ...he instrument unplug the power cord and allow the instrument to cool 2 Draw off the liquid with a pipette avoiding any contact with the skin 3 Transfer liquid residues to a proper disposal 4 Remove br...

Страница 22: ...e program for 150 C 60 minutes or the COD program for this block 5 When the heating phase is complete the thermometer temperature should be the same as the temperature shown on the display 3 3 Changin...

Страница 23: ...At Hach Company customer service is an important part of every product we make With that in mind we have compiled the following information for your convenience 23 General Information...

Страница 24: ...24...

Страница 25: ...40001 DRB200 2 with 21 holes for 16 mm vials and 4 compartments for 20 mm vials LTV082 53 42001 Operating Manual US Version DOC022 53 00619 Operating Manual D Version DOC022 72 00619 Protective Cover...

Страница 26: ...nada Latin America Africa Asia Pacific Rim HACH Company P O Box 389 Loveland CO 80539 0389 U S A Telephone 970 669 3050 FAX 970 669 2932 In Europe the Middle East or Mediterranean Africa HACH Company...

Страница 27: ...ephone 515 232 2533 FAX 515 232 1276 In Canada Hach Sales Service Canada Ltd 1313 Border Street Unit 34 Winnipeg Manitoba R3H 0X4 800 665 7635 Canada only Telephone 204 632 5598 FAX 204 694 5134 E mai...

Страница 28: ...repair not authorized by Hach Company any product not used in accordance with the instructions furnished by Hach Company freight charges to return merchandise to Hach Company freight charges on exped...

Страница 29: ...nts for equipment for measurement control and laboratory use per 89 336 EEC EMC Supporting test records by Hach Company certified compliance by Hach Company Required Standard s include EN 61000 4 2 IE...

Страница 30: ...1 this device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation Changes or modifications to this uni...

Страница 31: ...interference 2 If the Model DRB 200 Digital Reactor Block is connected into the same outlet as the device with which it is interfering try another outlet 3 Move the DRB 200 Digital Reactor Block away...

Страница 32: ...32...

Отзывы: