Figure 4 Analyzer components
1
Analyzer
6
5
Passive terminator, 120-ohm
2
Power cord, 115 VAC
6
BNC tee connector
3
Thermal paper (2x)
7
7
Sample tubing, ¼ in. OD, 1.7 m
(5 ft), PFA
4
Compression fitting, ¼-in. tube x ¼-
in. MNPT
8
Drain tubing, ¼ in. OD, 3.3 m
(10 ft), polypropylene
Figure 5 C80 controller components
1
C80 controller
4
Passive terminator
2
Trunk cable, 3.3 m (10 ft)
8
5
BNC tee connector
3
Power adapter, 9 VDC
Installation
D A N G E R
Multiple hazards. Only qualified personnel must conduct the tasks
described in this section of the document.
Installation guidelines
N O T I C E
Do not install the analyzer in an environment with a caustic atmosphere without a
protective enclosure. A caustic atmosphere will cause damage to electronic
circuitry and analyzer components.
N O T I C E
High internal temperatures will cause damage to instrument components.
6
A1000 S10 model shown
7
A1000 S20P and A1000XP models only
8
120-ohm, 24 AWG, shielded twisted pair cable made for EIA RS485 applications.
English
9
Содержание A1000
Страница 2: ...English 3 Deutsch 29 Italiano 57 Fran ais 83 Espa ol 110 2...
Страница 28: ...28 English...
Страница 56: ...56 Deutsch...
Страница 82: ...82 Italiano...
Страница 109: ...Fran ais 109...
Страница 136: ...136 Espa ol...
Страница 137: ......