2.5 Customer-supplied parts
Before installation, collect the components that follow. Refer to
Figure 4 Customer-supplied parts
1
Sample plumbing parts
6
Tubing, ¼-inch OD
3
2
Shutoff valve
7
Electrical parts
3
Tubing, ¼-inch OD
8
110/120 VAC: Wire conductors, 3.31 mm
2
(12 AWG)
4
Cooling water plumbing parts
3
9
220/240 VAC: Wire conductors, 2.08 mm
2
(14 AWG)
5
Shutoff valves (2x)
3
10
Conduit fitting for main power
Section 3 Installation
D A N G E R
Multiple hazards. Only qualified personnel must conduct the tasks described in this
section of the document.
3.1 Installation guidelines
Install the instrument:
• In a clean, dry, well-ventilated and temperature-controlled location. Refer to the operating
temperature and humidity specifications in
on page 3.
• In a location with no mechanical vibrations and electronic noise.
• As close to the sample source as possible to decrease analysis delay.
• Near an open drain.
• Away from direct sunlight and heat sources.
• So that the power switch is visible and easily accessible.
• In a location where there is sufficient clearance around it to make plumbing and electrical
on page 12.
3
Not applicable to instruments with the regenerative cooling option.
10
English
Содержание 9523sc
Страница 14: ...Figure 6 Connect power 14 English ...
Страница 41: ...Abbildung 6 Strom anschließen Deutsch 41 ...
Страница 69: ...Figura 6 Collegamento dell alimentazione Italiano 69 ...
Страница 97: ...Figure 6 Branchement de l alimentation Français 97 ...
Страница 125: ...Figura 6 Conexión de la alimentación eléctrica Español 125 ...
Страница 153: ...Figur 6 Tilslut strømmen Dansk 153 ...
Страница 180: ...Şekil 6 Güç bağlantısı 180 Türkçe ...
Страница 207: ...Εικόνα 6 Σύνδεση με την παροχή ρεύματος Ελληνικά 207 ...
Страница 235: ...Obrázok 6 Zapojenie do elektrickej siete Slovenský jazyk 235 ...
Страница 251: ......