Page 24
Probe Preparation
16116Install.fm
Section 2
Figure 17
RS485 Network (Typical)
2.10 Probe Preparation
Prior to operating the system, the chlorine probe must be prepared for use.
Preparation includes disassembly of the probe to install a new membrane and
to fill the probe with electrolyte. An exploded view of the chlorine probe is
provided in
Figure 18
Chlorine Probe Exploded View
2.11 New Membrane Pre-qualification Testing
The membrane used for the free chlorine probe must be checked for
absorbency prior to its installation.
1.
Fill a cup with tap water.
2.
Using tweezers, gently place a membrane on top of the water surface,
being careful not to immerse the membrane. The membrane must float on
top.
1
2
3
4
1
1
1
2
2
2
3
3
3
4
4
4
4000 ft. (Max.)
TB6 (Instrument #N)
TB6 (Instrument #N – 1)
TB6 (Instrument #1)
Threaded Membrane Cap
Membrane
Membrane O-ring
Probe Canister
Fill Screw
and O-ring
Silver Anode
Probe O-ring
Probe Tip
Probe Body
Probe Body
Screws (3)
Содержание 8450
Страница 2: ...Visit http www hach com ...
Страница 8: ...Visit http www hach com ...
Страница 50: ...Page 50 SYS Menu 16116Operation fm Section 3 ...
Страница 62: ...Visit http www hach com ...
Страница 66: ......