![Haas CM Series Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/haas/cm-series/cm-series_installation-manual_575892009.webp)
Electrical power must be phased properly to avoid damage to your equipment. The Power Supply
Assembly PC board incorporates a "Phase Detect" circuit with neon indicators. When the orange neon is lit
(NE5), the phasing is incorrect. If the green neon is lit (NE6), the phasing is correct. If both neon indicators
are lit, you have a loose wire; check the connections. Adjust phasing by setting the source power to off and
then swapping L1 and L2 of the incoming power lines at the main circuit breaker.
Danger: ALL POWER TO CNC MUST BE TURNED OFF LOCKOUT-TAGOUT AT THE SOURCE PRIOR TO
ADJUSTING PHASING. ALWAYS DOUBLE CHECK THE INCOMING LINES WITH AN AC VOLTAGE DETECTOR.
Turn off the power and set the main circuit breaker to OFF. Close the door, lock the latches, and turn the
power back on.
Remove the key from the control cabinet and give it to the shop manager.
8
Activation
When the machine is properly placed and connected to both air and electrical power, it is ready for final
installation (removing shipping blocks, leveling, spindle sweep, etc.) and software activation. The HFO
service technician does this. Contact the local HFO to schedule the work.
CM-1 Installation
Page 9 of 16 pages