2-1
2
Installing the AP
Installation flowchart
Figure2-1 Installation flowchart
Pre-installation tasks
Before installing the AP, perform the following tasks:
•
Connect the AP to a power source and the network. Examine the LEDs to verify that the AP is
operating correctly. For information about AP LEDs, see "Appendix B LEDs and ports".
•
Record the MAC address and serial number at the rear of the AP for future use.
•
Make sure you have completed cabling at the installation site.
•
Use Cat-5e or above network cables. For information about the supported interface rates, see
"Appendix B LEDs and ports"
.
•
The AP is typically installed on a high position. As a best practice, access and configure the AP
before installing it.
•
If a cable is routed outdoors, make sure a lighting arrester is attached to the AP port. Prepare a
lighting arrester yourself as needed.
Содержание WA6520
Страница 23: ...i Contents 1 Appendix A AP view and technical specifications 1 1 AP view 1 1 Technical specifications 1 1...
Страница 25: ...i Contents 3 Appendix B LEDs and ports 3 1 LEDs and buttons 3 1 Ports 3 2...
Страница 29: ...1 Contents 1 Appendix C Optional transceiver modules 1 1 Views 1 1 Specifications 1 1...