![H3C S9825 Series Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/h3c/s9825-series/s9825-series_manual_4421543032.webp)
3-31
The input power voltage is as required by the switch.
The console cable is connected correctly.
The configuration terminal (a PC, for example) has started, and its serial port settings are
consistent with the console port settings on the switch.
2.
Power on the switch.
During the startup process, you can access BootWare menus to perform tasks such as
software upgrade and file management. The BootWare interface and menu options vary by
software version. For more information about BootWare menu options, see the
software-matching release notes for the device.
3.
After the startup completes, you can access the CLI to configure the switch.
For more information about the configuration commands and CLI, see
H3C S9825 & S9855
Switch Series Configuration Guides
and
H3C S9825 & S9855 Switch Series Command
References
.
Содержание S9825 Series
Страница 18: ...2 17 Figure2 17 Installing the 1U slide rails...