background image

Figure 8

 

Installing the switch in the rack 

 

 

Grounding the switch 

 

CAUTION: 

 

Use the provided grounding cable (yellow-green grounding cable). 

 

Connect the grounding cable to the grounding system in the equipment room. Do not connect it to a fire 
main or lightning rod. 

 

Содержание S7508E-X

Страница 1: ...H3C S7508E X Switch Installation Quick Start New H3C Technologies Co Ltd http www h3c com hk Document version 6PW101 20170430...

Страница 2: ...her trademarks that may be mentioned in this manual are the property of their respective owners Notice The information in this document is subject to change without notice Every effort has been made i...

Страница 3: ...Installing the switch 3 Attaching the slide rails to the rack 3 Installing cage nuts 5 Installing the switch in the rack 6 Grounding the switch 7 Installing FRUs 8 Installing a power module 9 Connecti...

Страница 4: ...uide NOTE The figures in this installation quick start are for illustration only Chassis views and technical specifications Chassis views Figure 1 Front and rear panels 1 LPU slots 2 MPU slots 3 Power...

Страница 5: ...ecommendations To avoid equipment damage or bodily injury caused by improper use read the following safety recommendations before installation Note that the recommendations do not cover every possible...

Страница 6: ...nd the rear door for accommodating the chassis and card handles Installing the switch Attaching the slide rails to the rack 1 Read the signs on the slide rails to identify the left and right slide rai...

Страница 7: ...tall six cage nuts in the square holes in each rack post as shown in Figure 4 Figure 4 Installing a cage nut 4 Align the installation holes on the front end of a slide rail with the cage nuts on a fro...

Страница 8: ...e other slide rail Make sure the two slide rails are at the same height so that the switch can be placed on them horizontally Installing cage nuts 1 Determine and mark the cage nut installation holes...

Страница 9: ...use a minimum of two people to lift the switch H3C recommends that you use a mechanical lift to move the switch Do not hold the filler panels filler panel handles or the air vents of chassis to carry...

Страница 10: ...ch in the rack Grounding the switch CAUTION Use the provided grounding cable yellow green grounding cable Connect the grounding cable to the grounding system in the equipment room Do not connect it to...

Страница 11: ...8 Figure 9 Grounding the switch Installing FRUs Installing a card CAUTION Before installing a card in the chassis make sure the connectors on the card are not broken or blocked...

Страница 12: ...ore installation Do not install power modules of different models on the same switch To avoid power module damage move the power module by supporting its bottom instead of holding its handle After you...

Страница 13: ...10 Figure 11 Installing a power module Connecting power cords Connecting an AC power cord CAUTION Before you connect an AC power cord make sure the circuit breaker for the power cord is switched off...

Страница 14: ...nnecting a DC power cord CAUTION Provide a circuit breaker for each DC power cord Before connecting the DC power cord make sure the circuit breakers for both the positive and negative lines are switch...

Страница 15: ...onnect the crimped RJ 45 connector of the console cable to the console port on the switch Figure 14 Connecting the console port to a PC Setting terminal parameters To configure and manage the switch y...

Страница 16: ...see H3C S7508E X Switch Installation Guide Table 4 LED status when the switching is operating correctly Card LED Status MPU LINK Steady on ACT Flashing or off OK Steady on FAIL Off RUN Flashing ALM F...

Страница 17: ...I O S A Accessing the switch for the first time 12 C Chassis views and technical specifications 1 E Examining the installation site 3 I Installing the switch 3 O Obtaining documentation 13 S Safety re...

Отзывы: