background image

Manual Version: 6PW104-20170414 

BOM: 3123A0R7

 

ii 

Item Specification

Ambient humidity 

 

Operating: 10%RH to 95%RH, noncondensing 

 

Storage: 5%RH to 95%RH, noncondensing 

Compatible device model and slot 

 

M9006 gateway (slot 2 to slot 5) 

 

M9010 gateway (slot 0 to slot 3 and slot 6 to slot 9) 

 

M9014 gateway (slot 0 to slot 5 and slot 8 to slot 13) 

 

T9006 IPS (slot 2 to slot 5) 

 

T9010 IPS (slot 0 to slot 3 and slot 6 to slot 9) 

 

T9014 IPS (slot 0 to slot 5 and slot 8 to slot 13) 

 

 

LEDs 

The NSQ1GT48EA0 provides LEDs to show the operating status of the LPU. 

Table 2 LED description 

Status Description 

Flashing 

The port is sending or receiving data. 

On 

A link is present. 

Off 

No link is present. 

 

 

Installing and removing the NSQ1GT48EA0  

 

 

CAUTION: 

 

Wear a well-grounded ESD-preventive wrist before you install or remove the LPU. 

 

Do not touch the surface-mounted components directly with your hands when you install or remove
the LPU. 

 

4.1 

 

Installing the NSQ1GT48EA0  

1.

 

Face the front panel of the device. 

2.

 

Identify the slot to install the LPU, and remove the filler panel from the slot. 
This manual uses slot 3 as an example. 

3.

 

Place the LPU horizontally with the surface-mounted components facing upward. Pull outward the 
ejector levers and gently push the LPU in along the slot guide rails until the LPU is in close contact 

with the backplane. (See callout 1 in 

Figure 3 

.) 

4.

 

Push the ejector levers inward. (See callout 2 in 

Figure 3 

.) 

5.

 

Tighten the captive screws with a Phillips screwdriver to secure the LPU in the slot. (See callout 3 
in 

Figure 3 

.) 

Отзывы: