background image

 

3-3 

 

When installing the OAP card, note the following: 

z

 

Do not touch the components on the surface of the OAP card.  

z

 

Do not apply excessive force while installing the OAP card. If you cannot insert the OAP card 

smoothly, check whether the installation mode (reverse insertion) is correct.  

 

Step5 

Fasten the captive screws on the OAP card clockwise with the Philips screwdriver until the OAP card is 

fixed into the chassis. 

Remove an OAP card 

Step1 

Wear an ESD-preventive wrist strap, ensure a good skin contact and make sure that the 

ESD-preventive wrist strap is properly grounded. 

Step2 

Loosen the captive screws on the OAP card counterclockwise with the Philips screwdriver until all 

spring pressure is released. 

Step3 

Hold each ejector lever with a hand and pull the ejector levers outward (see (4) in 

 

Figure 3-5). Then pull 

out the OAP card slowly along the guide rails (see (3) in 

 

Figure 3-5).  

Figure 3-5 

Remove the OAP card 

 

(1) OAP card 

(2) Rear panel of the switch 

(3) Removal direction of the OAP card 

(4) Unlocking direction of the ejector levers 

 

 

The protection panel on the OAP card surface has a yellow warning label 

, indicating that this 

area corresponds to the inner heat radiator. After the OAP card runs for a period of time, this area may 

be very hot. So keep your hands away from the area while removing the OAP card to avoid being hurt.  

 

Содержание LSWM1WCM10

Страница 1: ...H3C OAP Cards User Manual New H3C Technologies Co Ltd http www h3c com Manual Version 6PW102 20180112 ...

Страница 2: ...ine SecPath SecCenter SecBlade Comware ITCMM and HUASAN are trademarks of New H3C Technologies Co Ltd All other trademarks that may be mentioned in this manual are the property of their respective owners Notice The information in this document is subject to change without notice Every effort has been made in the preparation of this document to ensure accuracy of the contents but all statements inf...

Страница 3: ... cause data loss or damage to equipment Means a complementary description Obtaining Documentation and Technical Support To obtain up to date documentation and technical support go to http www h3c com and select your country or region Depending on your selection you will be redirected to either of the following websites At http www h3c com Documentation To access the most up to date H3C product doc...

Страница 4: ...ance 2 1 Front Panel 2 1 Appearance 2 1 Description of the LEDs 2 1 Management Ethernet Port 2 2 Hardware Specifications 2 3 3 Installing an OAP Card 3 1 Installing and Removing an OAP Card 3 1 Connecting the Management Ethernet Port Cable 3 4 Verifying the Installation 3 4 ...

Страница 5: ...ttack defense and P2P flow control thus effectively ensuring network security supports multiple VPN services such as IPsec VPN thus allowing you to build various VPNs supports multiple routing protocols such as RIP OSPF and BGP thus providing abundant routing capabilities Using a firewall card a switch can implement security functions such as firewall and VPN to ensure network security LSWM1IPS10 ...

Страница 6: ...all card Appearance Figure 2 1 OAP card appearance 1 Ejector lever 2 Fastening screw captive screw 3 Front panel of the OAP card Front Panel Appearance Figure 2 2 Front panel of an OAP card 1 CF card interface 2 Management Ethernet port 3 CF card status LED CFS 4 Management Ethernet port status LED Management 5 System status LED RUN 6 PWR LED Description of the LEDs The front panel of an OAP card ...

Страница 7: ...reen Steady green The CF card is normal and no read write operation is performed Blinking green The CF card is normal and a read write operation is performed Off No CF card is in the slot Management Ethernet port status LED Management Green Yellow Steady green A 1000 Mbps link is present but no data is being received transmitted Blinking green Data is being received transmitted at a rate of 1000 M...

Страница 8: ...OAP card hardware specifications Item Specification Remarks CPU MIPS eight cores 1 GHz Memory 2 GB Avoid replacing the memory by yourself to prevent damage to the OAP card Number of CF card interfaces on an OAP card and the supported specifications z Provides one CF card interface and one 1 GB CF card when shipped z Supports a CF card with a maximum capacity of 1 GB z To replace a CF card make sur...

Страница 9: ...trap ensure a good skin contact and make sure that the ESD preventive wrist strap is properly grounded Step2 Loosen the captive screws on the blank panel counterclockwise with a Phillips screwdriver as shown in Figure 3 1 and remove the blank panel from the slot to be used Keep the removed blank panel properly for future use Figure 3 1 Remove the blank panel 1 Rotation direction of the Phillips sc...

Страница 10: ...card Figure 3 3 Reversely insert an OAP card Step4 Push the OAP card slowly along the guide rails see 3 in Figure 3 4 and then push the ejector levers inward to lock the OAP card in position see 4 in Figure 3 4 Figure 3 4 Install the OAP card to the switch 1 2 3 4 1 OAP card 2 Rear panel of the switch 3 Insertion direction of the OAP card 4 Locking direction of the ejector levers ...

Страница 11: ...rly grounded Step2 Loosen the captive screws on the OAP card counterclockwise with the Philips screwdriver until all spring pressure is released Step3 Hold each ejector lever with a hand and pull the ejector levers outward see 4 in Figure 3 5 Then pull out the OAP card slowly along the guide rails see 3 in Figure 3 5 Figure 3 5 Remove the OAP card 1 OAP card 2 Rear panel of the switch 3 Removal di...

Страница 12: ...n OAP card to the Ethernet port of a PC or router use a crossover cable z To connect the management Ethernet port of an OAP card to the Ethernet port of a hub or switch use a straight through cable Step2 After the OAP card is powered on check the management Ethernet port status LED on the front panel of the OAP card If the LED is on a link is present if the LED is off no link is present and you ne...

Отзывы: