OPERATION:
**VERY IMPORTANT**
1
-
Before you plug in the power cord, confirm that the On/Off
toggle switch is in the Off position.
This prevents the heating
element from
heating before it is submerged in the water. Confirm
that the tilt switch
is in the down position.
2
-Plug in the power cord. The fan will run, water will now flow
into the boiler
after about 1 minute delay
. Observe the water
level, water should stop flowing into the boiler when the element is
submerged 1-1.5 inches.
3-
Place the On/Off toggle switch in the ON position. Miniature
bubbles will begin to appear on the heating element.
4-
Close the boiler cover and refasten the spring clips.
Your new distiller is now in its normal run position. Distilled water
will begin to be made within a few minutes. When the storage tank
is full, the unit will turn off automatically. The first tank of
distilled water will be hotter than normal. This only occurs at the
first fill cycle.
- 10 -