Installing the induction coil 

(continued)

 

9. Installing the induction coil on copper pipe will need a double layer coil. Wrap the first layer coil as men-
tioned on the previous page.

 

10. When finished wrapping the first layer and securing to the pipe with a cable tie, then another layer of 
wrapping must be applied on top of the first layer of wrappings with the remaining wire.

 

11. The second layer of wrappings must be wrapped with the same rotation as the first layer of wrappings (if 
the first layer is clockwise then the second layer must be clockwise also or if the first layer is counter clock-
wise then the second layer must be counter clockwise also).

 

12. When the second layer is complete secure the wire down to the pipe with a cable tie (both wire leads will 
exit on the same end of the induction coil).

 

Note: Keep  induction coil far away as possible  from  elbows, 

tees and couplings  and never wrap coil on top of any fitting.

 

Double layer coil wrap

 

Coil Chart for PVC, CPVC and PEX 

 

NPS Pipe size

 

Layers

 

Approx. Coil 

Length

 

1/2”

 

Double

 

4.5”

 

3/4”

 

Single

 

8”

 

1”

 

Single

 

7”

 

1 1/4”

 

Single

 

6”

 

1 1/2”

 

Single

 

5.5”

 

Note: Always 

use specified 

length and lay-

ers of  wraps for 

your pipe size.

 

Содержание EWC-MAX-i

Страница 1: ...H2oEliteLabs Max i Residential model indoor installation Operation Manual H2oEliteLabs com ...

Страница 2: ... Mounting the control module installing the induction coil Page 6 Installing the induction coil coil chart Page 7 Coil chart connecting the power adapter Page 8 Connecting induction coil Features and notifications Page 9 Optional Equipment Technology and how it works Page 10 Benefits of the H2oEliteLabs Max i Page 11 Warranty information and product support ...

Страница 3: ...teel pipe In the event that galvanized or steel pipe is present A section of the galvanized or steel pipe must be removed and replaced with copper PVC or PEX pipe The induction coil then has to be applied onto the replaced section of pipe Elite Max i specifications Indoor use only Handles up to 35 gpg grains per gallon or 598 ppm Up to 5 000 sq ft home Works on copper PVC CPVC and PEX Up to 1 25 d...

Страница 4: ...present the induction coil can be applied at this location also Additional plumbing may be required This line may or may not treat kitchen faucets or outside spigots 4 Customers using well water must apply induction coil after the pump and pressure tank if present The Elite Max i is an indoor only model Provisions for outdoor locations must be considered 5 The Elite Max i can be used in conjunctio...

Страница 5: ...wrapping 3 When applying the single layer or double layer style coil determine how long of coiling and layers needed for your size and material pipe refer to coil wrap chart on pages 6 7 4 To begin the coil wrapping mark the length of the coil needed for your pipe size and type Then measure out between 1 and 15 of wire for the first lead to the control module the lead wires from the coil to the co...

Страница 6: ...f the first layer is clockwise then the second layer must be clockwise also or if the first layer is counter clock wise then the second layer must be counter clockwise also 12 When the second layer is complete secure the wire down to the pipe with a cable tie both wire leads will exit on the same end of the induction coil Note Keep induction coil far away as possible from elbows tees and couplings...

Страница 7: ... Adapter The control module comes with a 115 VAC power adapter with a 5 cord Part number CUI SW125 5 N P5 Only use supplied power supply This must be inserted into the power receptacle jack in the bottom of the control module Once the power adapter is inserted into the control module plug the power adapter into the nearest wall outlet If there is not a wall outlet near an extension cord can be use...

Страница 8: ... Features and Notifications Example of wire with the insulation removed The Elite Max i comes equipped with four color illumination and sound notifications 1 The buttons on the front and wire receptacle holes on the bottom of the control module will illuminate a white light to aid with the installation of the coil wires 2 The logo halo will stay solid red until a coil is detected Once the coil is ...

Страница 9: ...ult to remove is Calcite similar to cement or grout in Harness Our Unique approach converts Calcite to Aragonite Aragonite is a powdery material that can be easily wiped off surfaces Our Magnetic field changes the surface tension of the water and some of the water molecules break into HO and H ions This ionic change allows Calcium to bind with OH ions creating Calci um Hydroxide Ca OH 2 which is w...

Страница 10: ...for your health To har ness the full effect of the H2oEliteLabs Max i it may take up to 90 days to completely remove scale buildup from the entire plumbing system The removal of scale build up from pipes and equipment may worsen water quality initially this is normal When the decaling effect removes scale build up from the system in severe cases this may clog up faucet aer ators and may have miner...

Страница 11: ...cidents abuse tampering misuse fire lightning or any catastrophic acts of God If malfunction or failure results the H2oElite Max i will be repaired or replaced by the manufacture and returned to the original owner for a period of 3 years from the date of purchase This warranty is limited to the original retail purchaser and is non transferable To claim your warranty Please call 800 940 8424 You mu...

Страница 12: ...12 H2oEliteLabs com 800 940 8424 ...

Отзывы: