H2O USRO4-50-JG Скачать руководство пользователя страница 6

7. RO Unit Installation 

The RO unit is normally mounted to the right or left sink 

cabinet sidewall, depending on where supply tank is to be 

located. Generally the unit is installed at the front of the 

cabinet and the tank at the rear. 

To mount the unit, elevate it at least 2” off the floor, level 

it and mark the location of mounting holes needed. Drill 

hole for mounting screws and install screws allowing the 

mounting bracket slots to slip over them. 

Note: 

If the cabinet sidewalls are not solid, unit may sit 

on the floor with screws used just to keep it against the 

cabinet in a vertical position. 

8. Pre-fill & Supply Tank Placement 

Pre-filling the storage tank is recommended so there is 

sufficient pressure to check for leaks and water to flush 

the carbon post filter. To do this connect the feed line that 

will serve the RO unit directly to the bladder tank. A 3/8” x 

1/4” reducer is provided for this purpose. Allow the water to 

fill the bladder until it stops. Close the tank valve, shut off 

the feed pressure, release the tube from the reducer and 

remove the reducer from the tank valve.

The supply tank should be placed under the counter or 

within 10 feet of the RO unit. 

Note: 

Tanks are pre-pressurized with air at 7 psi. 

9. Final Tubing Connections

With all components in place, complete final tubing 

connections with these guidelines: 

1.  Tubing should follow contour of the cabinets.

2.  Cut tubing to correct length using square cuts and a 

proper cutting tool

3.  Make sure there are no crimps in the tubing.

4.  Keep tubing from the RO unit to the tank and faucet as 

short as possible for good flow. 

5.  The Drain line is a short ¼” tube connected to the 

membrane housing. On this tube is a 3” cylindrical 

drain flow restrictor. This is where the drain line 

connects to the RO unit. Do not remove the drain flow 

restrictor as this will cause a failure in the system.

Icemaker hookup (optional and requires a T fitting and 

additional shut-off valve not supplied with RO unit)

The RO unit can be connected to any standard refrigerator 

icemaker or ice maker/water dispenser.

(Do not connect to a commercial type bar icemaker) 

To complete this operation, connect a T with a shut 

off valve into the faucet tubing and route tubing to the 

refrigerator. (Hooking up to existing copper tubing is not 

recommended due to possible corrosion) Turn off icemaker 

inside freezer prior to turning off the existing tap water 

supply line to the refrigerator. Turn on the icemaker after 

the RO system has been drained several times and the 

tank has a full supply of water. 

Icemaker lines are often run in the rafters of unfinished 

basements or finished basements with drop ceilings and 

then up to the fridge. If the basement has a hard ceiling, 

this won’t be an option and the line would have to be run 

through cabinets. In cases where a basement or cabinets 

connecting sink and fridge are not available, icemaker 

connections cannot be made.

Note: 

Before any service is performed on the RO system, 

turn off icemaker valve and icemaker unit. Turn back on 

only after RO system has been sanitized and flushed out.

System Start-up

Prior to start-up:

1.  Check all fitting connections.

2.  Open angle stop valve, allow system to pressurize and 

check for leaks.

3.  Open valve on bladder tank and open faucet until 

water flows.

4.  Close faucet, wait five minutes and check for leaks.

5.  Allow system to produce a full tank of RO water. (2-3 

hours)

Flushing System and Checking Operation

1.  Flip the faucet lever up and this will keep faucet on. Do 

this and allow tank to completely drain of all water.

! Do not use this water !

2.  Close faucet and re-inspect system for leaks.         

3.  Allow system to produce water for 4 hours, at this point 

the bladder tank will be full.             

4.  Open faucet again and allow tank to empty for a 

second time. 

! Do not use this water !

5.  Close faucet and allow unit to produce another tank of 

water.

6.  At this point supply line to ice maker connection 

(optional) may be opened and RO water is ready to be 

consumed.

Replacing Filters & Sanitizing The System

Each year the filters in the system should be replaced. 

Usually the membrane can be replaced every other year, 

but the prefilters and post-filter should be changed annually 

and in some cases more often.

Filter Replacement                                                   

                                                 

1.  Turn off valve on bladder tank.

Содержание USRO4-50-JG

Страница 1: ...ion and Service Guide Reverse Osmosis System with Quick Connect Fittings USRO4 50 JG USRO4 60 JG USRO4 100 JG USRO5 50 JG USRO5 60 JG USRO5 100 JG Please read this manual carefully before attempting installation ...

Страница 2: ...he O ring provides a permanent leak proof seal 3 Pull on the tube to check that it is secure It is a good practice to test the system prior to leaving site and or before use 4 To disconnect ensure the system is depressurized before removing the tube Push in collet squarely against face of fitting With the collet held in this position the tube can be removed The fitting can then be re used Note See...

Страница 3: ...not go any further To ensure that your tubing has made a snug fit pull back gently on the tubing it should catch Always check for leaks to ensure a watertight connection see Figure 1 Tools The following tools may be necessary depending on each particular installation variable speed electric drill 2 500 RPM is best for stainless steel metal cutting bits Concrete drill bits for porcelain sinks Phill...

Страница 4: ...cutting bit to continue to cut through the metal below the porcelain surface 4 Continue to enlarge the pilot hole with larger masonry metal cutting bits until the hole is 1 2 Installation procedures for Stainless Steel Sinks Procedures 1 Mark the center with center punch for the 1 4 pilot hole 2 Drill the pilot hole 3 Continue to enlarge hole with larger size drill bit until it is 1 2 4 Clean up s...

Страница 5: ...y to either replace the old valve and riser tube with new 3 8 parts or use an alternative connection to draw the water supply to the reverse osmosis system Alternatives include self piercing valves T fittings and faucet adaptors that connect between the faucet and the top of the riser tube Please consult your distributor or an installation professional for additional assistance 4 Drain Saddle Valv...

Страница 6: ...ker or ice maker water dispenser Do not connect to a commercial type bar icemaker To complete this operation connect a T with a shut off valve into the faucet tubing and route tubing to the refrigerator Hooking up to existing copper tubing is not recommended due to possible corrosion Turn off icemaker inside freezer prior to turning off the existing tap water supply line to the refrigerator Turn o...

Страница 7: ...ly until water comes out of faucet 8 Close the faucet 9 Allow water to run for 5 minutes 10 Turn off water feed with angle stop valve 11 Allow solution to stand for 30 minutes 12 Open faucet and allow system to drain 13 Remove water from housings before installing new filters and membrane 14 Install new filters tighten housings and reconnect all tubing connections 15 Open angle stop valve and chec...

Страница 8: ......

Отзывы: