
Solenoid Pump Instructions
Now insert the solenoid pump wires into the water
meter terminal block. 2 wires will share 1
connection position. The black wire connects to
the #1 connection and the red wire connects to
the #2 connection. Tighten the connections and
ensure that both the water meter wires and the
solenoid pump wires are not loose.
After the pump has been properly wired to the
controller, plug the pump into the power outlet and
proceed to priming section.
Priming
Place the foot valve/strainer into a container of the
solution to be pumped, again following all
applicable safety procedures for the chemical
being pumped.
The priming valve located on the back of the
pump should be opened to assist with priming the
pump. If the pump is equipped with a universal or
priming IPF, the priming valve on the IPF can be
used instead of the valve on the pump.
Ensure that the stroke capacity knob on the pump
is set to 100%.
Be careful to only adjust the stroke
capacity knob when the pump is pumping.
Damage will occur if the knob is adjusted
while the pump is off.
Prime the pump by using the ‘Prime’ feature on
the J+ Advanced controller. See the J+ Advanced
manual for instructions. Continue the priming
routine until solution can be seen flowing from the
priming valve. Once solutions starts to run out the
vent of the priming valve, close the priming valve
and cease priming the pump.
These instructions should be repeated for each
pump if multiple pumps are installed.
If the pump will not prime properly, check all the
tubing connections for tight connections and
repeat the priming process. If prime still cannot be
achieved, consult factory support.
WARNING!
When working with
hazardous chemicals use
extreme caution and carefully
follow the handling instructions
and safety procedures in the
Material Safety Data Sheets. Use
only the 04094 Universal IPF
when feeding acid.
START-UP
●
Place the foot valve/strainer into the filled
solution tank.
●
If installing it as a bulkhead fitting, install it
about 2 inches above the bottom of the
tank, to prevent the strainer from
becoming fouled by sediment which may
collect on the bottom.
●
Set the pumpers to the number on the dial
calculated to give the desired feed. Fill
your concentrate tanks and restart your
feeder. It should now be operational. You
may need to check, as done in the initial
check-out, to be sure the pumpers are
properly primed.
●
Make sure the pump controller is properly
configured by referring to the controller
specific manual.
●
Turn on flow to begin operation.
MAINTENANCE
Normally the pump should require little
maintenance. This, however, depends on the
quality and cleanliness of the chemical being
pumped.
Before any maintenance or service is performed,
observe the following precautions:
●
Disconnect the Solenoid Pump from
power source.
●
Drain chemical from discharge tubing.
●
Disconnect discharge tubing from pump.
●
If the Solenoid Pump is used in a flooded
Solenoid Pump 10-2017
5
H.E. Anderson Co.
Do not connect SP here
Water Meter Wire
Solenoid Pump Wire