PEL-3211(H) User Manual
18
Power Up
Steps
1.
Insert the AC power cord into the power
socket.
2.
Turn the external
power switch on.
(O → —)
3.
When the power is turned on the LINK/STBY
indicator will light up.
STBY indicator on the front panel will become
red when the power is on.
STBY
LINK
LINK STBY
Note
If the LINK/STBY indicator fails to light up, please see
your local distributor.
Load Wiring
Wire Gauge
considerations
Before connecting the booster packs to a DUT, the
wire gauge must be taken into account. Load
wires must be large enough to resist overheating
when a short-circuit condition occurs as well as
maintain a good regulation. The size, polarity and
length of a wire are all factors in determining if a
wire will withstand short circuiting.
Wires that are selected must be large enough to
withstand a short circuit and limit voltage drops
to no more than 2V per wire. Use the table below
to help make a suitable selection.