Model FF-1600 with out Heat
12
17942C-1, Issue 1
Figure 2 Hose Connection Locations
5.
Connect the Hose Assemblies together as follows. See Figure 3 and Figure 4.
NOTE
:
The hoses are Connected end to
end during shipment to protect
them from moisture intrusion Do
not separate the hoses until they
are ready for coupling to the
proportioning unit.
IMPORTANT
: It is important to make proper hose connections. The connection
points are a potential source of chemical and airs leaks and are susceptible to
damage from scuffing and snagging on abrasive surfaces. A liberal amount of duct
tape can be used in this area to make the bundle as compact as possible. Gusmer
recommends the installing of the optional scuff jacket to protect the hose insulation
from damage
a)
Lay out Hose
assemblies as shown.
Figure 3 Hose Connection Step (A)
b)
Connect Hose
Assemblies as shown
taking care not to
cross thread or over-
tighten the fittings,
there by assuring a
leak proof chemical
connection.
Figure 4 Hose Connection Step (B)
*** Repeat Step 5 for adding additional hoses. ***