background image

25

GÜNZBURGER STEIGTECHNIK is regarded in Europe 
and abroad as the leading source for ladders, rolling 
scaffolds and special constructions. Not least because 
you receive a 15 year quality guarantee on our products.  

Access technology from Günzburg has been a tradition 
for over 117 years. The company is now managed by the 
fourth generation of the founding family. With around 250 
committed employees, GÜNZBURGER STEIGTECHNIK 
develops and manufactures all-round intelligent solutions. 

It’s no coincidence, then, that our motto is ‘Climb smart!’. 
But what exactly do we mean by this? Quite simply: 
Clever products and product details with practical added 
value for our customers. 

For instance, the nivello

®

 ladder shoe for increased anti-slip 

and stability or the ergonomic innovation the ergo-pad

®

 

grip zone for stepladders and the ‘roll-bar’ traverse for rung 
ladders for back-friendly and ergonomic handling of ladders. 

The retrofittable clip-step tread pad for stepladders ensures 
enhanced occupational safety. The new certified clip-step 

R13 tread pad features additionally improved slip resistance, 
especially in wet and oil-smeared working environments.

We have always placed particular importance on the fact 
that production takes place exclusively at our company 
headquarters in Günzburg, Bavaria. This down-to-earth 

company policy has produced a unique promise: 15 years 
of quality guarantee always give you the positive and 
secure feeling that you’ve chosen the right product with 
GÜNZBURGER STEIGTECHNIK. 

We see manufacturing at our home base as a quality 
feature and philosophy at the same time - and this is 
another area where we’re among the pioneers: We are the 

first company whose products were certified by TÜV Nord 

with the ‘Made in Germany’ seal of approval.

And talking about awards: For our high innovative strength, 
growth potential, corporate responsibility and willingness to 
train, we were presented with the ‘Bayerns Best 50 (2014)’ 
award by the Bavarian State Ministry of Economic Affairs 
and Media, Energy and Technology, and were recently 
named a ‘TOP 100 Innovator’. We’re proud of these awards, 
coming on the heels of the Großer Preis des Mittelstandes 
(the German Grand Prix of Medium-Sized Enterprises) and 
the Bayerischer Mittelstandspreis (the Bavarian equivalent), 
which give our passion for access technology even more 
impetus. 

Sustainability isn’t just an empty phrase, but tradition 
and self-image, and can be found in all areas where the 
company creates value. To be truly sustainable in the 
long term, you need a balanced relationship between 
economic success and active environmental and social 
responsibility. All our actions are guided by this conviction 

and are comprehensively documented for the first time in 
the industry’s first sustainability report.  

The solutions developed by GÜNZBURGER 
STEIGTECHNIK are used in numerous areas: In industry 
and trade, by public clients and of course also in the 
private sector. 

Содержание FlexxTower

Страница 1: ...www steigtechnik de Stand 13 05 2020 00250 125 10 9 Montage und Verwendungsanleitung FlexxTower Artikel Nummer 125100 Fahrbare Arbeits b hne nach DIN EN 1004 max Arbeitsh he 6 10 m DE EN...

Страница 2: ...irmenpolitik ist ein einzigartiges Versprechen 15 Jahre Qualit tsgarantie geben Ihnen stets das gute und sichere Gef hl sich mit G NZBURGER STEIGTECHNIK f r das richtige Produkt entschieden zu haben F...

Страница 3: ...Rollen des Ger stes 8 2 7 Abbau 9 2 8 Verhalten bei Arbeiten an elektrischen Anlagen und Freileitungen 9 3 Montage 10 3 1 Montage Transportwagen 10 3 2 Montage FlexxTower 11 4 St ckliste 17 5 Aufbauv...

Страница 4: ...Wirksamkeit der Bremsen berpr fen Sie die Einrastklauen die Schnellverschl sse und deren Sicherung an den Gel ndern den Plattformen und Dreiecksauslegern Diese Montage und Verwendungsanleitung entspri...

Страница 5: ...muss die maximal zul ssige Belastung eingehalten werden Nicht gegen den Seitenschutz stemmen Nicht an die Handl ufe oder dar ber hinaus lehnen Ger ste die auf Verkehrswegen aufgestellt sind stets geg...

Страница 6: ...ern kg Keine schweren Gegenst nde von und auf das Ger st heben Keine pendelnden Lasten auf dem Ger st absetzen Lasten nicht heranziehen Starke horizontale und vertikale Belastungen vermeiden Ger st n...

Страница 7: ...nen Montageschritte werden ab Seite 10 grafisch beschrieben Ein abweichender Aufbau Ger stes siehe Seite 18 ist nur dann zul ssig wenn die geltenden Sicherheitsbestimmungen ab Seite 5 eingehalten wer...

Страница 8: ...en auf dem Ger st lagern Nach dem betreten einer Plattform Klappe der Plattform komplett schlie en Die Arbeit ist nur auf einer Plattform mit vollst ndigem Seitenschutz ein schlie lich Gel nder und Bo...

Страница 9: ...en Ber hren gesichert wurden Bei Arbeiten in der N he von elektrischen Freileitungen muss ein ausreichender Sicherheitsabstand eingehalten werden Nennspannung Volt Schutzabstand Meter Bis 1 kV 1 m ber...

Страница 10: ...10 DE 3 Montage 3 1 Montage Transportwagen 1 2 klick 1 2 3 4 1x 8x 4x 4x...

Страница 11: ...11 DE 3 2 Montage FlexxTower 1 2 3 4 klick...

Страница 12: ...12 DE 5 6 ca 45 ca 45 ca 90 freistehender Aufbau wandseitiger Aufbau...

Страница 13: ...13 DE 7 8 9 10 11...

Страница 14: ...14 DE 13 14 12...

Страница 15: ...15 DE 15 16 17 18...

Страница 16: ...16 DE 20 21 19...

Страница 17: ...10 m Pos Artikelbezeichnung Bestell Nr Anzahl 1 Aufsteckrahmen 012905 10x 2 Plattform mit Klappe 012931 2x 3 Gel nder 012955 6x 4 Dreiecksausleger 012926 4x 5 Bordbrett Stirnsteite 012913 2x 6 Bordbr...

Страница 18: ...Aufbau bis ca 3 10 m Arbeitsh he Arbeitsh he Gel nderh he Plattformh he Gesamth he Ger st min Anzahl Plattformen ca 2 35 m ca 1 40 m ca 0 40 m ca 2 30 m 1 ca 2 60 m ca 1 65 m ca 0 65 m ca 2 30 m 1 ca...

Страница 19: ...3 30 m 1 ca 3 60 m ca 2 65 m ca 1 65 m ca 3 30 m 1 ca 3 85 m ca 2 90 m ca 1 90 m ca 3 30 m 1 ca 4 10 m ca 3 15 m ca 2 15 m ca 3 30 m 1 Arbeitsh he Gel nderh he Plattformh he Gesamth he Ger st min Anz...

Страница 20: ...itsh he Gel nderh he Plattformh he Gesamth he Ger st min Anzahl Plattformen ca 5 35 m ca 4 40 m ca 3 40 m ca 5 30 m 2 ca 5 60 m ca 4 65 m ca 3 65 m ca 5 30 m 2 ca 5 85 m ca 4 90 m ca 3 90 m ca 5 30 m...

Страница 21: ...er Lenkrollen auf Funktion pr fen Verstellspindel auf G ngigkeit pr fen Bei Bedarf schmieren Klappe der Plattform auf G ngigkeit pr fen Bei Bedarf die Scharniere der Klappen schmieren Wenden Sie sich...

Страница 22: ...n Spr hfett z B HHS 2000 schmieren WARNUNG Rutschgefahr Das Schmier l darf nicht auf Trittfl chen gelangen da hierdurch die Verletzungsgefahr durch Ausrutschen besteht bersch ssiges Schmier l sofort e...

Страница 23: ...Lagerung von Ger stbauteilen Die Ger stbauteile m ssen vor sch digenden Einfl ssen gesch tzt gelagert wer den Das Lagern der Ger stbauteile muss so erfolgen dass eine Besch digung ausgeschlossen werd...

Страница 24: ...ferung g ltige Bedienungsanleitung ma gebend ber die Verkaufs und Lieferbedingungen hinaus gilt Es wird keine Gew hr bernommen f r Personen und Sachsch den die aus einem oder mehreren der nachfolgende...

Страница 25: ...rs of quality guarantee always give you the positive and secure feeling that you ve chosen the right product with G NZBURGER STEIGTECHNIK We see manufacturing at our home base as a quality feature and...

Страница 26: ...8 Behaviour when working on electrical systems and overhead lines 32 3 Assembly 33 3 1 Assembly of transport trolley 33 3 2 Assembly of FlexxTower 34 4 Parts list 40 5 Installation variants 41 6 Maint...

Страница 27: ...the smooth running of the castors and the effectiveness of the brakes Check the snap in claws the quick release fasteners and their securing to the railings platforms and triangular outriggers These a...

Страница 28: ...ainst the side protection No leaning against the handrails or beyond them Scaffolds erected on traffic routes must always be secured against falling over The scaffolding may not be used to lay protect...

Страница 29: ...ay not be lifted from or onto the scaffolding Swinging loads may not be placed on the scaffolding Loads may not be pulled up Strong horizontal and vertical loads must be avoided The scaffolding may no...

Страница 30: ...ding Make sure that there is a sufficient safety distance from electrical installations 2 3 Installation The individual assembly steps are described graphically from page 33 on wards A different scaff...

Страница 31: ...t Tools or materials should not be stored on the scaffolding After entering a platform the platform flap must be completely closed Work is only permitted on a platform with full side protection includ...

Страница 32: ...s a sufficient safety distance must be maintained Nominal voltage volts Safety distance metres Up to 1 kV 1 m Over 1 kV up to 110 kV 3 m Over 110 kV up to 220 kV 4 m Over 220 kV to 380 kV 5 m With unk...

Страница 33: ...33 EN 3 Assembly 3 1 Assembly of transport trolley 1 2 klick 1 2 3 4 1x 8x 4x 4x...

Страница 34: ...34 EN 3 2 Assembly of FlexxTower 1 2 3 4 klick...

Страница 35: ...35 EN 5 6 ca 45 ca 45 ca 90 Free standing installation Wall mounted installation...

Страница 36: ...36 EN 7 8 9 10 11...

Страница 37: ...37 EN 13 14 12...

Страница 38: ...38 EN 15 16 17 18...

Страница 39: ...39 EN 20 21 19...

Страница 40: ...10 m Item Article description Order no Quan tity 1 Slip on frame 012905 10x 2 Platform with flap 012931 2x 3 Railing 012955 6x 4 Triangular outrigger 012926 4x 5 Toe board front sides 012913 2x 6 Toe...

Страница 41: ...ing height Working height Railing height Platform height Total height of scaffolding min Number of platforms approx 2 35 m approx 1 40 m approx 0 40 m approx 2 30 m 1 approx 2 60 m approx 1 65 m appro...

Страница 42: ...65 m approx 1 65 m approx 3 30 m 1 approx 3 85 m approx 2 90 m approx 1 90 m approx 3 30 m 1 approx 4 10 m approx 3 15 m approx 2 15 m approx 3 30 m 1 Working height Railing height Platform height Tot...

Страница 43: ...height Total height of scaffolding min Number of platforms approx 5 35 m approx 4 40 m approx 3 40 m approx 5 30 m 2 approx 5 60 m approx 4 65 m approx 3 65 m approx 5 30 m 2 approx 5 85 m approx 4 9...

Страница 44: ...f the swivel castors Check the freedom of movement of the adjusting spindle Lubricate if neces sary Check the freedom of movement of the platform flap Lubricate the hinges of the flaps if necessary Co...

Страница 45: ...y availa ble spray grease e g HHS 2000 WARNING Danger of slipping The lubricating oil must not get on treading surfaces as there is a risk of injury from slip ping Excess lubricating oil must be remov...

Страница 46: ...6 EN 7 Storage of scaffolding components The scaffolding components must be stored protected from damaging influences The scaffolding components must be stored in such a way that they cannot be damage...

Страница 47: ...s decisive for war ranty claims The following applies over and above the conditions of sale and delivery No guarantee is given for personal injury or damage to property that has occurred for one or mo...

Страница 48: ...r Industrie und Au enanlagen F r die Transportlogistik Rettungstechnik Feuerwehrleitern Rettungsplattformen Transportk sten Rollcontainer Service Montagearbeiten Reparatur und Wartung Pr fdienst und D...

Отзывы: