17
.............................
CCEC/ OM Manual GlasStile GSS 1.6 EN
07
.2009
Installation Routines
Note -
The GlasStile GSS should
NOT
be installed under a desk.
When planning the installation, it is important that everything is measured accurately and that
all cable ways are marked out. All cables must be laid according to the specification indicated before
installation begins.
All Electrical work MUST be carried out by a qualified engineer
1.
Place the foundation plate and the centre column in the selected position. Turn the centre
colum
n so that the marking ‘INDEX 0’ on the non-rotating part, ends up as shown in Fig 5.1 to
ensure that the panel can rotate without interference from the walls
Fig 5.1
– Opening in Both Directions (180
O
)
Fig 5.2
– Opening in Both Directions (90
O
)
Содержание GlasStile GSS
Страница 2: ...CCEC OM Manual GlasStile GSS 1 6 EN 07 2009...
Страница 14: ...14 CCEC OM Manual GlasStile GSS 1 6 EN 07 2009 Standard Dimensions Fig 4 1 Standard GlasStile GSS Dimensions...
Страница 15: ...15 CCEC OM Manual GlasStile GSS 1 6 EN 07 2009 Component Location Fig 4 2 Main Component Identification...
Страница 30: ...30 CCEC OM Manual GlasStile GSS 1 6 EN 07 2009...
Страница 32: ...32 CCEC OM Manual GlasStile GSS 1 6 EN 07 2009 Section 8 Declaration of conformity Declaration of conformity...
Страница 33: ...33 CCEC OM Manual GlasStile GSS 1 6 EN 07 2009 Notes...