General information
37
Checklist installation
The following checklist provides a general description of how
the installation is carried out.
Place the heat pump on a firm and horizontal surface.
;
Make sure that the area is well drained and supply
enough air for the evaporator.
Open the service hatch and remove the enclosed
;
installation kit. Ensure that all component parts have
been delivered.
Mount the heat pump, with a bypass, in series after the
;
sand filter. Exercise care to ensure the inlet and outlet are
installed correctly.
Connect the electricity.
;
Operating mode Check carefully to ensure there is
;
sufficient circulation before start up.
Adjust the flow to the pool heat pump to the right level
;
Check the settings
;
Read more about the installation in section 2.
Guarantee conditions
The component parts of the system must be transported,
stored, installed and used in accordance with the provisions
set out in the manual.
Repairs must be carried out by an accredited installation
engineer. Original parts must be used for repairs.
The guarantee becomes void if the conditions above are
violated.
Safety Regulations
It is especially important to take into account the following
safety instructions when handling, installing and using the
heat pump:
Only qualified persons may work on the product’s
•
cooling system.
Always disconnect the power supply before working on
•
the system.
36