
General information
6
Checklist installation
The following checklist provides a general description of how
the installation is carried out.
;
Place the heat pump on a firm and horizontal surface.
;
Open the service hatch and remove the enclosed
installation kit. Ensure that all component parts have
been delivered.
;
Route the pipes for incoming and outgoing water.
Exercise care to ensure the inlet and outlet are installed
correctly. Mount the heat pump after the sand filter.
;
Install a bypass for regulating the right partial flow for
the pool heat pump.
;
Connect the electricity.
;
Energise and check the settings.
;
Put in operation and adjust the flow to the pool heat
pump to the right level.
Read more about start up in section 2 under the heading –
Starting up the unit.
Guarantee conditions
The component parts of the system must be transported,
stored and installed in accordance with the provisions
set out in the manual.
Repairs must be carried out by a qualified engineer. Original
parts must be used for repairs.
The guarantee becomes void if the conditions above are
violated.
Safety Regulations
It is especially important to take into account the following
safety instructions when handling, installing and using the
heat pump:
•
Only qualified persons may work on the product’s
cooling system.
•
Always disconnect the power supply before working on
the system.
7