Installing .the .traverse .rail .
Place the traverse rail, the last B-rail,
on its side and mount an end stop, a
trolley/hoist, and an end stop in the
above order.
The rubber tips of the end stops
must face towards the trolley/hoist
and be positioned in the middle of
the rail. Install the traverse rail at the
mountings plates at the traverse trol-
leys.
Inspection .
Check that the traverse rail runs freely
between the parallel rails.
The traverse rail should be at an equal distance to the parallel rail at both
ends after mounting.
Adjusting .the .end .stops .on .the .parallel .rails .
Loosen the four end stops on the parallel rails, position them correctly and
tighten them at the top brackets. Run the traverse rail towards the end stops
at one end and adjust the traverse rail so that the two trolleys touch the end
stops simultaneously. Follow the same procedure for the opposite end.
Adjusting .the .end .stops .in .the .tra-
verse .rail .
Loosen the two end stops in the tra-
verse rail (pos. 1). Position the end
stops in the traverse rail (one at each
end) and tighten them.
Inspection .
Check that all screws and nuts are tightened correctly
and that the rail system is stable before putting the
system into operation.
2 .00 .
Description .of .functions
2 .01 .
Operation
Transport/running .in .the .rail .system
Depends on the selected hoist/lifting module.
2 .02 .
Mounting .the .charging .liner .connector
See user´s manual of the selected hoist/lifting module.