background image

V . .Guldmann .A/S

Corporate Office:

Graham Bells Vej 1-3A

DK-800 Århus N

Tlf. 

+45 8741 3100

Fax 

+45 8741 3131

[email protected]

www.guldmann.dk

Guldmann .Inc .

555 Johns Road

Suite 905

Tampa, FL 33634

Tel. 

800 664 8834

Tel. 

813 880 0619

Fax 

813 880 9558

[email protected]

www.guldmann.net

©

 G

ul

dm

an

G

B

/U

S

-1

51

5/

08

/0

• 

550536

Содержание Pontus 550371

Страница 1: ...GB Pontus free standing B rail systems Vers 1 00 ...

Страница 2: ...e rail system 6 1 08 Installing Pontus room covering rail system 6 2 00 Description of functions 9 2 01 Operation 9 2 02 Mounting charging liner connector 9 3 00 Dismounting and transport 10 3 01 Dismounting Pontus 10 3 02 How should Pontus be transported 10 3 03 How should Pontus be packed during transport 10 4 00 Maintenance and storage 10 4 01 Cleaning 10 4 02 Storage 10 4 03 How is corrosion p...

Страница 3: ...installed and taken down by no less than two persons The Pontus maximum load of 250 kg must not be exceeded In the case of damages to the Pontus system discontinue use Pontus is purpose built for lifting people Pontus should be installed on a plane surface Pontus must not be used for any other purpose than that stated in the user s manual that is neither as a playground or a swinging device 1 04 L...

Страница 4: ... pcs 5 End stops 6 pcs not illustrated 6 Trolleys for traverse rail 2 pcs not illustrated 7 Plastic endcaps 4 pcs 1 06 Mounting prior to installing Pontus single rail system Mounting the top brackets etc The top bracket pos 1 should be mounted to the leg pos 2 first Make sure that all screws pos x and y are loosened so the bracket easily slides over the leg First tighten the 3 screws nuts pos x on...

Страница 5: ...s by tightening the pointed screws on the sides of the feet with a 5 mm Allen key pos 5 Connecting the charging liner connector Insert the output wire from the transformer through the cut out section in the foot see figure above and pull it up through the support post and out of the triangular hole at the top of the bracket Then insert the wire back into the bracket through the nearest hole Mount ...

Страница 6: ...y support if necessary Loosen the end stops and tighten these as close to the top bracket as required Insert the connector at an angle approximately 7 12 in the end of the rail between the topbracket and endstop and fix this into place by tightening the pointed screw through the track opening of the rail so the pins are pressed against the copper tracks at the bottom of the rail 1 08 Installing Po...

Страница 7: ...all four legs with top brackets as stated Mounting trolleys for traverse rail in two parallel rails Place the B rail on its side and mount an end stop pos 5 a traverse trol ley pos 6 and an end stop in the above order The rubber tips of the end stops should be facing towards the traverse trolley Positioning the trolley in the middle of the rails The mounting plate at the traverse trolley must face...

Страница 8: ... the approximately final height Insert the top bracket with leg into the end of the rail making sure to push the rail as far into the bracket as possible while checking that the mounting plate is positioned correctly in the upper track of the rail Remember to place the top brackets so that they are facing the same way as the mounting plate at the traverse trolley Tighten the M10 lock nuts to a tor...

Страница 9: ...s on the parallel rails position them correctly and tighten them at the top brackets Run the traverse rail towards the end stops at one end and adjust the traverse rail so that the two trolleys touch the end stops simultaneously Follow the same procedure for the opposite end Adjusting the end stops in the tra verse rail Loosen the two end stops in the tra verse rail pos 1 Position the end stops in...

Страница 10: ...tion 3 01 3 03 How should Pontus be packed during transport Guldmann recommends that Pontus after being dismounted is always trans ported in its original packaging 4 00 Maintenance and storage 4 01 Cleaning Clean Pontus with a damp cloth using ordinary household detergents Chemicals or an autoclave must not be used when cleaning Pontus 4 02 Storage Pontus should be stored in a dry room in which th...

Страница 11: ... to the brackets are tightened If the result of the above checks is satisfactory and the fault has not been detected contact the distributor or the manufacturer 6 00 Technical specifications Pontus single rail system Dimensions HxW 2400 x 2690 mm Maximum lifting capacity 250 kg Lifting interval 2000 mm Total weight without lifter Single rail system 38 0 kg Legs 9 0 kg MAXI rail 20 0 kg Pontus room...

Страница 12: ... DK 8200 Århus N Tlf 45 8741 3100 Fax 45 8741 3131 info guldmann com www guldmann dk Guldmann Inc 5525 Johns Road Suite 905 Tampa FL 33634 Tel 800 664 8834 Tel 813 880 0619 Fax 813 880 9558 info guldmann net www guldmann net Guldmann GB US 1515 08 09 550536 ...

Отзывы: