8
©
Guldmann
GB/US
-02/2021 • # 550216_19
©
Guldmann GB/US
-02/2021 • # 550216_19
1 .07
Unpacking and Preparation
Visual check of the GH3.
1.
2.
3.
4.
5.
If the GH3 is thought
to be damaged upon
reception, the GH3 must
not be used before it
has been checked and
approved by a qualified
person or the Guldmann
Service Team.
Contents of the box
GH3 hoist
Hand control
Transformer
Manual
Label for rail system
1
3
2
1 .08
Placing a new GH3 Hoist in an existing rail system
Please notice that when, placing a new GH3 hoist in an existing rail system it
must be ensured that:
•
The rated max load of the rail system, must be equal to or higher than the
max load of the new hoist.
– If there is no max load mentioned on the rail system, the rail system
must then be checked according to the guideline in the installation
manual (distance between bracket according to max load)
– If the brackets are not visible, then a load test with 1,5 x max load of
the hoist must be performed for a minimum of 20 min. The deflection of
rails must not be higher than 1/200 of the length of the rail.
– If it is not possible to do any of the above mentioned, please contact
Guldmann or their representative
•
If the rail system can not be rated to the same max load as the hoist,
then extra brackets must be installed according to the installation
manual (distance between bracket according to max load).
Class I equipment
Fixed rail systems are class I equipment and
must
be installed by a qualified
technician or by Guldmann Service Team.
Equipment is disconnected from Supply Mains by breaking the mains breaker
switch.
Emergency stop device
The emergency stop device must be reset in order to connect power to the
product. To do this, push the yellow reset button
(see point 2.09)
.
Содержание GH3 Twin
Страница 1: ...1 GB US GH3 GH3 Ceiling Hoist Manual vers 19 ...
Страница 2: ...2 Guldmann GB US 02 2021 550216_19 ...