13
1. Lift the strap with the hanger towards the end stop on GH2 F
2. Choose the function “deinstallation” with the help of the switch at the bottom
of the hand control
3. Deinstallation is begun by briefly activating the toggle switch on the hand con-
trol, direction DOWN
4. Deinstallation has been completed when GH2 F is on the transport trolley and
the movement of the cord has stopped
5. Release the travelling trolley’s anchor with cord from
the locking mechanism on the top of GH2 F (point
8.02)
6. Move the switch at the bottom of the hand control to position
We recommend steering/guiding GH2 F with the hanger into position on the
transport trolley during deinstallation.
Please note
All deinstallation must be begun by briefly moving GH2 F (1-2 seconds) in an
upward direction.
It is not possible to begin the installation and/or deinstallation sequence for
GH2 F when the load on the lifting strap exceeds the standard weight of the
lifting hanger, e.g. if a person is sitting in the lifting sling.
For the same reason a bath chair, a bath stretcher, Horizontal Hoist BS, and
the cross lifting hanger must be removed before installing/deinstalling GH2 F.
The installation/deinstallation function will be switched off if the 24V DC plug
on the charger is connected to the hand control (point 9.00).
The installation/deinstallation function will be switched off if the emergency
stop/emergency lowering function is activated (point 4.00/8.00).
(
)
(
)
©
G
ul
dm
an
n
U
S
-8
82
/1
2/
20
11
•
#
900690_1.01
©
G
ul
dm
an
n
U
S
-8
82
/1
2/
20
11
•
#
900690_1.01
©
G
ul
dm
an
n
U
S
-8
82
/1
2/
20
11
•
#
900690_1.01
©
G
ul
dm
an
n
U
S
-8
82
/1
2/
20
11
•
#
900690_1.01