24
GTB 16/5R | GTB 16/12RL
GB
ENGLISH
Inspection and maintenance plan
Regular servicing period
Before
any start-
up
Whenever
the device
is put into
operation
After 1
months
After 3
months
After 6
months
After 12
months
20
Hours of
operation
50
Hours of
operation
100 Hours
of opera-
tion
300 Hours
of opera-
tion
Check the safety equipment
Check the V-belt and tighten
it if necessary
6
Apply a thin layer of oil on
the pillar and the bench
Apply some fat on the angle
drift
Remove drill cuttings and
metal chips from the device
Provide appropriate servicing upon the earlier of the following: in the given month or after the specifi ed hours of
operation have expired.
Failure removal
Failures Causes
Removal
Engine not
starting
The micro switch in the belt housing prevents starting if
the housing is not closed properly.
Close the belt housing
properly!
Drill is turning
unevenly
The choke is not fi tted properly on the angle drift.
Push in the chuck by light
tapping.
Содержание 55190
Страница 85: ...81 GTB 16 5R GTB 16 12RL ...