4
9
6
7
Connect the flight batter y to the crossfire.
Installed the four rotors in properly.
2
3
1
Check the v ideo transmission working
well with picture and video
9
Installation the full charged flight batter y into
the CROSSFIRE.
B
anding the flight batter y in tightly with the
batter y band.
C
over on the canopy to the Crossfire
P
ower on the transmitter, and put the throttle
stick to the bottom.
ARM the main flight controller system
Start the four motors turning.
please ARMED
t he main flight controller system after you
anding. Then take off the flight batter y
from CROSSFIRE.
1
1
.
Q
uick
star t
flight
procedures
5
7
l
Содержание Crossfire 280 Series
Страница 1: ...280 R ...
Страница 5: ...6 Transmitter Control layout ...