Flush Mount Roof Application
1) Place the mount in
desired location. Mark
the two teardrop shaped
holes and insert (2) nails.
Leave nails sticking up
approx. ¼”. Place the
mount on the nails and
slide into locking
position.
2) Install (8) ¼” x 2”
fasteners into the
holes as shown in the
picture. If going into
plywood, substrate
must be ½” CDX or
better. If going into
metal, substrate must
be 24 gauge or better.
If going into concrete,
use a fastener such as
a Tapcon ® screw, and
fully embed in concrete.
3) Slide the guardrail
receiver into the mount
as shown and install
guardrail post.
4) Align the post so it
sits vertically. Post rungs
must face in towards
work surface. Insert pins
as shown to lock post in
place. Applicable for
roof pitches of 3/12,
6/12, and 9/12 ONLY.
5) Once pins are
installed, your assembly
should appear as shown.
Install toeboards if
necessary.
1) Install (8) ¼” x 2”
fasteners into the holes as
shown in the picture. If
going into plywood,
substrate must be ½” CDX
or better. If going into
metal, substrate must be
24 gauge or better. If going
into concrete, use a fastener
such as a Tapcon ® screw,
and fully embed in concrete.
2) Slide guardrail post
receiver into the mount
as shown. Align with
holes so base is
perpendicular with
roof deck.
3) Slide guardrail
post into receiver.
Post rungs must
face in towards
work surface.
Insert pins as
shown to lock
post in place.
Pitched and Barrel Roof Application