background image

WIND GENERATOR USER’S MANUAL

4.2 Foundation

Dig the hole for foundation as per the tower. As the following photo:

Содержание EW1000

Страница 1: ...WIND GENERATOR USER S MANUAL EW user s manual ...

Страница 2: ...ind speed m s 2 5 2 5 2 5 2 5 Rated wind speed m s 12 5 12 12 12 Survival wind speed m s 45 45 45 45 Working form PMG PMG PMG PMG Rated revolution RPM 650 650 650 650 Rotating direction Clockwise Clockwise Clockwise Clockwise Blade NO piece 5 3 3 3 Blade material Nylon Nylon Nylon Nylon Tower height m 6 6 9 9 Suggest supporting capacity battery 12V100AH 1 12V100AH 2 12V150AH 2 12V150AH 4 Net weigh...

Страница 3: ...GENERATOR USER S MANUAL 2 Structure No Description No Description 1 Nose cone 7 Rotor 2 Blades 8 Slip ring 3 Hub 9 Back cover 4 Front cover 10 Flange 5 Generator case 11 Tail vane 6 Stator 12 Back nose cone ...

Страница 4: ...ator Installation Connect the out going cables to the terminals at the bottom of the generator and elicit the cable from outlet of the bottom of the tower A Install the flange on the top of the tower and make 6 pieces M10 55 bolts fasten ...

Страница 5: ... USER S MANUAL B Install the blades on the hub and make 3 pieces M8 25 bolt fasten C Put the hub onto the shaft and make M16 nut fasten at the same time turn the blades clockwise till the hub connect the shaft tight ...

Страница 6: ...USER S MANUAL D Install the nose cone on the front of the hub and make one piece M6 40 bolt fasten E Connect the cable from the generator to the controller Before make sure battery and controller cable connected well ...

Страница 7: ...rienced technical person 2 Keep the electrical part controller inverter battery away from corrosive gas and wet environment 3 Controller should be connected with battery before it connected with wind turbine 4 Do not open the generator and controller system doing the maintenance without notice or instructions 5 Installation should be done under no wind weather ...

Страница 8: ...WIND GENERATOR USER S MANUAL 4 Tower Installation 4 1 6M and 9M guy cable tower ...

Страница 9: ...WIND GENERATOR USER S MANUAL 4 2 Foundation Dig the hole for foundation as per the tower As the following photo ...

Страница 10: ...cages and the bottom boards are put together Please refer to the following the diagram the tie line of axis pin hole on the tower should be matched with the two side foundations Concrete the foundation with C25 concrete when the ground cages and foundation are placed well Please refer to the following diagram ...

Страница 11: ...the side ground cages into the side foundation and check the distance between the ring hook and foundation center When all the ground cages are basically in parallel concrete can be proceed Please refer to the following diagram when placing ...

Страница 12: ...ixing and the adjustment can be proceed easily Otherwise when erecting the tower the pull force for fixing steal cable might be too tight or too loose which will cause the tower bent down or downfall Please put the bottom section of the tower into the tower base and then insert the pin axis into the base and screw the pin axis Please refer to the following diagram ...

Страница 13: ...kle to the side cages Please refer to the following pictures Please connect the hand pulling block not supplied by us with one of the steal cable of the corresponding ground cages Please refer to the following diagram Pull the support pole and fix the steal cable on both ends on the side ground cages Then Connect the steel cables after all the tower sections are connected ...

Страница 14: ...be fixed by two clamps and there will be 10 to 20cm length on the end of the steel able Except for positioning the steel cable of the front ground cage the ends of all the rest steel cables should be connect to the relevant ground cages There is no need to tight them deadly To tight them tightly after the adjustment of the steel cable when the installation is finished Please refer to the following...

Страница 15: ...y period and after installation 2 Check all parts connecting cable whether is damaged the connection point is loose rust ensure electrical safety 3 In the storm or other bad weather comes before in order to avoid unpredictable loss occurs suggest to lie down the tower P S Suggest inspecting the system for every three months Picture color may be different with the objects Manual content if there ar...

Отзывы: