LE-v50 & LE-v50 Extreme Turbine 

 

Installation & Operation Guide 

 
 
 

 

 

 

A micro vertical axis turbine for trickle charging and low power 

applications... 

 

Leading Edge Turbines Ltd 

 
 
 
 

Содержание GA-LETU

Страница 1: ...ontrilas Hereford HR2 0BW UK www leadingedgepower com Rev K Page 1 of 30 LE v50 LE v50 Extreme Turbine Installation Operation Guide A micro vertical axis turbine for trickle charging and low power app...

Страница 2: ...s first 3 Introduction 4 Safety Precautions 5 Specifications 6 Package Contents 7 Tools Required For Assembly 7 Mechanical Assembly Procedure 8 Electrical Installation 11 Turbine Operation 16 Maintena...

Страница 3: ...ne to run without being connected to the battery Failing to do so will result in the turbine freewheeling causing premature wear and tear and unnatural blade noise 3 On arrival ensure the main rotor i...

Страница 4: ...perating life The LE v50 has been designed to be simple economic durable and yield excellent performance Specific LE v50 turbine features Innovatively designed axial flux alternator using neodymium ir...

Страница 5: ...ld be completed at ground level Ensure that the batteries are disconnected during the installation procedure Twist the turbine output cables together to create a short circuit during the mechanical in...

Страница 6: ...bine Name LE v50 Part Number GA LETU 010A Turbine Name LE v50 Extreme Part Number GA LETU 020A Rotor Diameter 270 mm Rated Wind Velocity 8 m s Nominal Voltage 12 24V 48V DC Rated Output 12 Watts Cut i...

Страница 7: ...ler immediately Tools Required For Assembly You will require the following tools to assemble your LE v50 turbine 13 mm A F spanner 13 mm ratchet one of each required 8mm A F spanner or ratchet A set o...

Страница 8: ...e will rotate freely E Retighten the upper and lower stub shaft fixings and check that the turbine still rotates freely F Reposition and fix the cowlings ensuring that they do not rub upon each other...

Страница 9: ...om the baseboard it can now be fitted in its intended position The cables should come out of the bottom of the turbine when mounted The LE v50 is supplied as standard with two universal flat mounting...

Страница 10: ...ficiency and cost in mind as it is unlikely that your turbine will be running at full capacity 100 of the time If in doubt consult your local electrical supplier The cable should be installed in accor...

Страница 11: ...approved conduit trunking Cable strain relief Prevent mechanical strain on the transmission cables running down the tower from the turbine Clip the cables to the inside of the tower Failure to do this...

Страница 12: ...Normally the LE v50 turbine does not require any external charge control equipment to be installed in the system Due to the low Tip Speed Ratio of the turbine the turbine output decreases naturally a...

Страница 13: ...eford HR2 0BW UK www leadingedgepower com Rev K Page 13 of 30 Fig 4 Simple Stand Alone battery charging wiring diagram LE v50 Turbine Battery Bank wired to the appropriate voltage and capacity VE Tran...

Страница 14: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leadingedgepower com Rev K Page 14 of 30 Fig 5 Stand Alone battery charging requiring DL 300 controller...

Страница 15: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leadingedgepower com Rev K Page 15 of 30 Fig 5 Typical Hybrid wind solar system...

Страница 16: ...the rotor speed increases so too will the current and voltage Shut Down If Run Stop switch is fitted A run stop switch is not required with the LE v50 turbine but one can be installed if desired see...

Страница 17: ...mance If many dents have occurred along the edges of the blades a new set of rotor blades should be fitted part numbers available in the Spares section Remove any build up of dirt and debris from the...

Страница 18: ...bine Please contact your nearest Leading Edge Turbines Dealer and quote the part numbers listed below Rotor Blade DP LETU 145 Rotor Bearing Housing DP LETU 198 Bearing Service Kit OS 296 Stator 48VDC...

Страница 19: ...e warranty and may compromise the safety of the machine What is not covered by your warranty Damage caused by unsatisfactory installation of the turbine tower and or control equipment Damage caused by...

Страница 20: ...nderside of the chassis Disclaimer All specifications are subject to change without prior notice The information given in this user manual is believed to be accurate and reliable Leading Edge Turbines...

Страница 21: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leadingedgepower com Rev K Page 21 of 30...

Страница 22: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leadingedgepower com Rev K Page 22 of 30 Appendix 1 DL 300 Charge Controller User Manual...

Страница 23: ...plied to the battery and also in relation to the state of charge of the battery The DL 300 Features PWM Pulse Width Modulation for highest charging performance without flicker Selectable three stage c...

Страница 24: ...re that the correct size of cable has been selected If a cable of insufficient cross sectional area is used at any point in the electrical system heat will build up in the cables causing a potential f...

Страница 25: ...jumper be applied to pins 2 1 position shown to help locate pins 2 2 Use the correct voltage controller A 12V DL 300 controller should only be used on a 12V battery system A 24V DL 300 controller shou...

Страница 26: ...he DL 300 and batteries on the positive cable DL 300 Voltage Set Points Whilst operating the DL 300 does a multi stage charge based on time and the bulk and float voltages 12V Set points Mode Flooded...

Страница 27: ...Tel 44 0 1981 241668 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leadingedgepower com Rev K Page 27 of 30 Appendix 2 Run Stop Switch User Manual Only operate in light winds...

Страница 28: ...y rotate very slowly Position 2 Turbine Run position The turbine output is allowed to flow straight through the switch Safety Precautions Safety must always be your primary concern during the assembly...

Страница 29: ...Universal Run Stop switch is correctly wired as per these instructions and wiring schematics Incorrect wiring may lead to a short circuit being placed across the batteries which can lead to fire or ex...

Страница 30: ...s Hereford HR2 0BW UK www leadingedgepower com Rev K Page 30 of 30 Contact Us Your Local Distributor Leading Edge Turbines Ltd Skyrrid Farm Pontrilas Hereford HR2 0BW UK Tel 44 0 1981 241 668 info lea...

Отзывы:

Похожие инструкции для GA-LETU