Страница 1: ......

Страница 2: ...22 12 NUTS M22 TBWA22 12 WASHERS M22 TBSW22 12 SPRING WASHERS M22 8 PCUB12 1 SET U BOLTS M12 Stainless Steel post cap assembly BASE 9 MPP 1 MAIN POST PLATE 250 X 250 Galvanized Steel 10 L B78 4 L ANCH...

Страница 3: ...layground Equipment 1 INSTALLATION MANUAL GSWeb Playground Equipment 1046 3 Najeon ri Saengnim myeon Gimhae si Gyeongsangnam do 621 821 Republic Of Korea Tel 82 55 326 9096 7 Fax 82 55 326 9022 E mail...

Страница 4: ...climbing structure made of steel loaded Nylon cables and comes protected against UV The GS W6001 features GS Web Technology which includes the highest steel content and the strongest connection materi...

Страница 5: ...ent shall extend no less than 72 in 1830mm from all sides of the play structure Fall Height a 4 11 1500mm from surface The Fall height on the extennal surface of a pyramid shaped space net is the high...

Страница 6: ...n Finished Grade Optional P1 Depth below finished Grade 12 300mm P2 Depth of concrete footing 27 1 2 700mm P1 Depth below finished Grade 12 300mm P2 Depth of concrete footing 27 1 2 700mm Figure 3 Exc...

Страница 7: ...ion Layout Figure 5 Concrete footing and Anchor plate layout 100 200 100 Anchor Plate position 4 4 Positioning Anchor plate on footing CF L anchor hole Front edge of anchor plate must be installed 4 1...

Страница 8: ...6 Wood support frame a b b wood support frame for concrete Assemble wooden support frames 4 frames 39 1000mm L x 31 800mm W x 27 700mm H 1 frame 24 600mm L x 24 600mm W x 27 700mm H Use min plywood n...

Страница 9: ...gure 7 Concrete footing work concrete footing work Pour wet concrete in the wooden support frame Concrete Pour concrete into wooden support frame until flush to top edge Allow 3 5 days for concrete to...

Страница 10: ...SWeb Playground Equipment 8 Remove the wood support frame Remove wood support frame from dry concrete blocks After concrete has cured enough remove frames and replace soil around footing to subgrade l...

Страница 11: ...O GS W6001 GSWeb Playground Equipment 9 Anchor Plate Assembly a Anchor Plate b Post plate Figure 9 concreted block clean threads of L anchor bolts Figure 10 Attach Anchor plate to footing with flat wa...

Страница 12: ...MBER MODEL NO GS W6001 GSWeb Playground Equipment 10 Post Assembly STEP 2 Figure 12 Insert Post following Nylon string Nylon string STEP 1 Figure 11 Find Nylon String Post Assembly Insert Post followi...

Страница 13: ...Figure 15 Post cap assembly Place Cap on Post Thread the mast through the net s center per diagrams below or following factory installed guide string After inserting post join main rope with M10 x L25...

Страница 14: ...e to A B C D M22 X L110 H T BOLT Safety Cable Attaching Attach safety cable to anchor plates A B C D E as shown in Figure 16 A A B C B C D D Figure 17 Safety cable Assembly After successfully preparin...

Страница 15: ...S W6001 GSWeb Playground Equipment 13 Placing Post in Position G B C E A D Figure 19 Safety cables attached Figure 18 Centre Post A B C D E F It is strongly recommended that 3 4 workers lift the net i...

Страница 16: ...round Equipment 14 Stand Net up A B C D E F H C B D A G E G After standing up the Net Attach remaining safety cables and Turnbuckles Figure 21 Loosen Turnbuckle all the way about 100mm leaving only 4...

Страница 17: ...Turnbuckles Figure 23 Turnbuckle assembly M22 X L110 H T BOLT Anchor plate Turnbuckle Tighten Rope with Turnbuckles at the Same time Tighten Rope with Turnbuckles at the Same time a a b b a a b b Tigh...

Страница 18: ...mage It is also recommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 mon...

Страница 19: ...yground Equipment 17 PARTS LIST 9 1 main post 2 multi compound rope 3 post cap 4 turn buckle 5 anchor shackle 6 shock proof ring 7 H T bolt nut washer 8 U bolt 9 main post plate 10 L anchor bolt nut w...

Страница 20: ...1 GSWeb Playground Equipment 18 Maintenance Installation A weekly check of the activity net is recommended to ensure that no acts of vandalism have damaged the rope Periodic checks on tension will ass...

Страница 21: ...sk should be corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the me...

Страница 22: ...maintenance of any impact attenuating surfaces d lubrication of bearings e markig of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or con...