13

Maintenance

C. Routine maintenance

To reduce accidents, the owner or operator should ensure that an appropriate routine maintenance schedule is established, implemented and 

maintained. This should take into account local conditions and the manufacturer's instructions that can affect the necessary inspection 

frequency. The schedule should list the components to be maintained and should also give procedures for dealing with complaints and 

breakdowns.

The routine maintenance of playground equipment and surfaces should consist of preventative measures to maintain their level of safety, 

performance and compliance with the relevant part(s) of EN 1176. Such measures should include:

a) tightening of fastenings;

b) re-painting and re-treatment of surfaces;

c) maintenance of any impact attenuating surfaces;

d) lubrication of bearings;

e) marking of equipment to signify loose fill finished surface level;

f) cleaning;

g) removal of broken glass and other debris or contaminants;

h) restoring loose fills to the correct level; and

i) maintenance of free space areas.

D. Corrective maintenance

Corrective maintenance should include measures to correct defects, or the re-establish the necessary levels of safety of the playground 

equipment and surfaces. Such measures should include:

a) replacement of fastenings;

b) welding of welding repairs;

c) replacement of worn or defective parts; and

d) replacement of defective structural components.

E. Personal safety

Repairs during operation that could put the safety of maintenance personnel of the public at risk, should be avoided.

F. Equipment alterations

Alterations to parts of a piece of equipment or structure that could affect the essential safety of the equipment should only be carried out 

after consultation with the manufacturer or a compete person.

Содержание GS-N101-1

Страница 1: ...2 years Capacity 21 children Size L7 81m x W2 56m x H4 41m Use zone L11 29 x W5 56 Completed Net Features The Whale features GS Web Technology which includes the highest steel content and the stronges...

Страница 2: ...fety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from all si...

Страница 3: ...oundation Information Attention Please refer to following details for foundation work Base plates are welded to the Rolling Hill s pipe After assembling pipes and nets fix the structure on the concret...

Страница 4: ...do Republic of Korea The Whale MODEL NO GS N101 1 Rev_0 2018 04 100 600 300 89 1 900 700 700 900 230 FL SAND 1 x 4 1 2 x 100L SET ANCHOR CONCRETE 900 700 SAND CONCRETE 8 x 4 1 2 x 150L SET ANCHOR 300...

Страница 5: ...nim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea The Whale MODEL NO GS N101 1 Rev_0 2018 04 300 89 1 SAND CONCREAT 1 x 4 1 2 x 125L SET ANCHOR 300 500 230 230 500 500...

Страница 6: ...event any confusion Divide all parts into groups Outside and Inside as below Attention It is very important to keep the stickers attached on the parts on until the installation is completed If the sti...

Страница 7: ...o Republic of Korea The Whale MODEL NO GS N101 1 Rev_0 2018 04 7 OVERALL ASSEMBLY Overall Assembly Assemble the pipes in alphabetical order 1 Check the pipes numbers on Stickers on them 2 As below pic...

Страница 8: ...m do Republic of Korea The Whale MODEL NO GS N101 1 Rev_0 2018 04 8 OVERALL ASSEMBLY PIPE Overall Assembly 1 Insert the post into Rolling hills pipe and assemble 2 Check the location 3 Fix the post on...

Страница 9: ...si Gyeongsangnam do Republic of Korea The Whale MODEL NO GS N101 1 Rev_0 2018 04 9 OVERALL ASSEMBLY NET Overall Assembly Assemble the parts in the following order 1 Check the net s name There are 4 s...

Страница 10: ...0 55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea The Whale MODEL NO GS N101 1 Rev_0 2018 04 10 OVERALL ASSEMBLY SLIDE Overal...

Страница 11: ...lay com Tel 82 0 55 326 9025 Fax 82 0 55 326 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea The Whale MODEL NO GS N101 1 Rev_0 2018 04 PARTS LIST Parts...

Страница 12: ...local regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e...

Страница 13: ...sures should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify...

Отзывы: