GSWeb Playground Equipment
E-mail) [email protected]
Website) www.gsweb21.com
Tel) +82 (0)55 326 9025
Fax) +82 (0)55 326 9026
65, Saengnim-daero 259beon-gil, Saengnim-Myeon
Gimhae-si, Gyeongsangnam-do, Republic of Korea
Diamond
MODEL NO.
Diamond_GS-DB101
GSWeb
Recreation Equipment
1:30
A1
-
A
2018.04.06
H.S.CHOI
DRAWING TITLE
PROJECT TITLE
J.H.L
-
CAUTION!!!!
Finishing material is sand, its height("H") is 300mm.
The height will vary according to finishing materials.
If needed, please provide us informations of it.
FOUNDATION 1 DETAIL
SCALE 2:1
56
35
6149
40
65
5932
Safety Area
50
00
40
45
FL=0
700
70
0
50
0
SA
N
D
3
00
300
30
0
CON'C
<SIDE VIEW>
<PLAN>
FOUNDATION 2 DETAIL
SCALE 2:1
30
0
1470
1470
20
0
4-M10xL100
Set Anchor B/N
FOUNDATION 3 DETAIL
SCALE 1:1
FOUNDATION 5 DETAIL
SCALE 2:1
90
50
245
245
245
245
245
245
1800x800
40
0
50
0
1800
80
0
250
25
0
1000
FL=0
1x8-M10x200L
Set Anchor B/N
30
0
600
60
0
200
20
0
30
0
40
0
<SIDE VIEW>
<PLAN>
<SIDE VIEW>
<PLAN>
4x4-M12x150L
Set Anchor B/N
1x4-M10x100L
Set Anchor B/N
FL=0
<SIDE VIEW>
<PLAN>
GSWeb
Recreation Equipment
1:10
A1
-
A
2018.04.06
H.S.CH OI
DRAWING TITLE
PROJEC T TITLE
J.H.L
-
FOUNDATION 4 DETAIL
SCALE 2:1
<SIDE VIEW>
<PLAN>
500
60
0
50
0
500
250
10
0
2x1-M16xL150
Set Anchor B/N
30
0
917
917
183 4
12
9
7
136 4
183 4
104 7
149 6
656
11
6
1
372
917
CON'C
CON'C
CON'C
CON'C
Safety Area
F1
F1
F1
F1
F1
F2
F3
F4
F5
917
917
183 4
12
9
7
136 4
183 4
104 7
149 6
656
11
6
1
372
917
F1
F1
F1
F1
F2
F3
F4
F5
7
Frame Assembly
A
B
D
C
Focus on this method.
(connection direction)
!! Focus on this method.
!Attention
It is very important to keep the stickers attached on the parts
on until the installation is completed.
If the stickers are detached during the installation, it might be
difficult to check whether the parts are correctly assembled in
correct order and position.
Quite much recommended to take care that no sticker is
detached before installation is completely finished.
The information on stickers is made up of part name and
number such as ‘D1’ to ‘D2’, .. etc.
Overall Assembly
Assemble the parts in the following order:
1. Check names of the parts.
-
From “A” to “D” are Main Pipe’s name.
-
From “E1” to “E3” are Sub Pipe’s name.
2. To prevent any confusion, Divide all parts into groups,
Outside and Inside as below.
E2
E1
E3