background image

GSWeb Playground Equipment

E-mail) [email protected]

Website) www.gsweb21.com

Tel) +82 (0)55 326 9025

Fax) +82 (0)55 326 9026

65, Saengnim-daero 259beon-gil, Saengnim-Myeon

Gimhae-si, Gyeongsangnam-do, Republic of Korea

Diamond

MODEL NO.

Diamond_GS-DB101

3

Safety area

Safety area 

Safety area 

The requirements for space and safety clearances are taken from 

BS-EN 1176-1 / ASTM-F1487 / CSA Z614

The use zone for stationary play equipment shall extend no less than 

72 in. (1830mm) from all sides of the play structure. 

GSWeb

Recreation  Equipment

1:30

A1

-

A

2018.04.06

H.S.CHOI

DRAWING TITLE

PROJECT TITLE

J.H.L

-

CAUTION!!!!

Finishing material is sand, its height("H") is 300mm.
The height will vary according to finishing materials.

If needed, please provide us informations of it.

FOUNDATION 1 DETAIL

SCALE  2:1

56

35

6149

40

65

5932

Safety Area

50

00

40

45

FL=0

700

700

500

SA

N

D

 30

0

300

300

CON'C

<SIDE VIEW>

<PLAN>

FOUNDATION 2 DETAIL

SCALE  2:1

300

1470

1470

200

4-M10xL100

Set Anchor B/N

FOUNDATION 3 DETAIL

SCALE  1:1

FOUNDATION 5 DETAIL

SCALE  2:1

90

50

245

245

245

245

245

245

1800x800

400

500

1800

800

250

250

1000

FL=0

1x8-M10x200L

Set Anchor B/N

300

600

600

200

200

300

400

<SIDE VIEW>

<PLAN>

<SIDE VIEW>

<PLAN>

4x4-M12x150L

Set Anchor B/N

1x4-M10x100L
Set Anchor B/N

FL=0

<SIDE VIEW>

<PLAN>

GSWeb

Recreation  Equipment

1:10

A1

-

A

2018.04.06

H.S.CHOI

DRA WING TITLE

PRO JECT TITLE

J.H.L

-

FOUNDATION 4 DETAIL

SCALE  2:1

<SIDE VIEW>

<PLAN>

500

600

500

500

250

100

2x1-M16xL150

Set Anchor B/N

300

91

7

91

7

1834

12

97

1364

1834

1047

1496

65

6

11

61

37

2

917

CON'C

CON'C

CON'C

CON'C

Safety Area

2800

20

00

3521

23

24

Safety Area

Содержание Diamond_GS-DB101

Страница 1: ...emoving the reticulated system Check of removing condition each rope Screwing the turn buckle and conversion the turnbuckle in anchors plate see for this work step turnbuckle assembly 2 Abrasion condition of rope Checking of all rope surface Strengthened of rope Coating on the surface 3 Attachment condition of the anchors plate and turnbuckle 4 Screwing condition of all bolt 5 Galvanizing conditio...

Страница 2: ...series is a steel framed climbing structure made of steel loaded Nylon cables and comes protected against UV The GS Diamond features GS Web Technology which includes the highest steel content and the strongest connection materials in the industry including a steel wire core in our edge ropes and connection points crushed in place with over 75 tons of pressure to ensure long life of the games and m...

Страница 3: ...si Gyeongsangnam do Republic of Korea Diamond MODEL NO Diamond_GS DB101 3 Safety area Safety area Safety area The requirements for space and safety clearances are taken from BS EN 1176 1 ASTM F1487 CSA Z614 The use zone for stationary play equipment shall extend no less than 72 in 1830mm from all sides of the play structure Safety Area 2800 2 0 0 0 3521 2324 Safety Area ...

Страница 4: ...6 9026 65 Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea Diamond MODEL NO Diamond_GS DB101 4 Foundation Information Foundation Please refer to Diamond drawing for exact installation dimensions 917 917 1834 129 7 1364 1834 1047 1496 656 116 1 372 917 F1 F1 F1 F1 F2 F3 F4 F5 ...

Страница 5: ...ETAIL SCALE 2 1 FL 0 700 700 500 300 300 300 CON C SIDE VIEW PLAN FOUNDATION 2 DETAIL SCALE 2 1 300 1470 1470 200 4 3 8 xL100 Set Anchor B N FOUNDATION 3 DETAIL SCALE 1 1 FOUNDATION 5 DETAIL SCALE 2 1 90 50 245 245 245 245 245 245 1800x800 400 500 1800 800 250 250 1000 FL 0 1x8 3 8 x200L Set Anchor B N 600 600 200 200 300 400 SIDE VIEW PLAN SIDE VIEW PLAN 4x4 1 2 x150L Set Anchor B N 1x4 3 8 x100L...

Страница 6: ...aero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea Diamond MODEL NO Diamond_GS DB101 6 Overall Assembly SLIDE ASS Y FRAME ASS Y NET ASS Y Overall Assembly Assemble the parts in the following order 1 Check names of the parts 2 To prevent any confusion Divide all parts into groups Outside and Inside as below ...

Страница 7: ... installation is completed If the stickers are detached during the installation it might be difficult to check whether the parts are correctly assembled in correct order and position Quite much recommended to take care that no sticker is detached before installation is completely finished The information on stickers is made up of part name and number such as D1 to D2 etc Overall Assembly Assemble ...

Страница 8: ...Saengnim daero 259beon gil Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea Diamond MODEL NO Diamond_GS DB101 M1 Safety Mesh 8 Net Safety Mesh Assembly Note How to assembly Net and Safety Mesh Used the No N1 M1 Installed as below You can find label Focus on place the label N1 Climb Net Socket Rope RH M8 Bolt SET ...

Страница 9: ...Saengnim Myeon Gimhae si Gyeongsangnam do Republic of Korea Diamond MODEL NO Diamond_GS DB101 9 Slide Assembly Note How to assembly Slide Used the No S1 S16 Installed as below You can find label Focus on place the label S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13 S14 S15 S16 Slide Assembly Please check and understand slide No Fit the same No as below ...

Страница 10: ...m Myeon Gimhae si Gyeongsangnam do Republic of Korea Diamond MODEL NO Diamond_GS DB101 10 Slide Assembly No SP1 No 303 RH Bolt M10 x L40 No SP2 No 305 RH Bolt M10 x L20 No 212 Set Anchor M16 x L125 No 211 Set Anchor M16 x L125 No 302 RH Bolt M10 x L25 Slide Assembly Please check and understand slide No Fit the same No as below Right assembly Wrong assembly ...

Страница 11: ...so recommended that subsequent checks on tension should be carried out at monthly intervals and adjusted as required This will increase the overall longevity of the product Checking 1 month Refer to IPEMA and TUV maintenance system After Net structure tension is completed the net will stretch slightly over the first four weeks of use Following this initial period the net needs to be fully re tensi...

Страница 12: ...al regulations B Procedures Defects that occur during operation and which put safety at risk should be corrected without delay If this is not possible the equipment should be secured against use e g by immobilization or removal There should be written operational procedures covering the measures to be taken in the event of accidents fire and the like Until unsafe equipment is repaired and released...

Страница 13: ...s should include a tightening of fastenings b re painting and re treatment of surfaces c maintenance of any impact attenuating surfaces d lubrication of bearings e marking of equipment to signify loose fill finished surface level f cleaning g removal of broken glass and other debris or contaminants h restoring loose fills to the correct level and i maintenance of free space areas D Corrective main...

Отзывы: