- 12 -
STI 1932 CT
3.3 P
otential
equalisation
(Pe)
Equalise the potential (PE) in accordance with IEC/EN/DIN EN 60728.
• Connect the PE connection terminal
17
to a PE rail (supplied by customer)
using the PE wire (Cu 4 mm
2
- 9 mm
2
).
3.4 C
onneCting
the
deviCe
• Connect the MPTS inputs
1
and
2
to the LAN network via CAT-6 cables.
—> The device requests the required multicast IP streams via the MPTS
inputs every 60 seconds.
Querier requests will not be answered!
Keep this in mind when configuring the network (Querier host time-
out > 60s).
—> You will find descriptions to important terms for configuring a
streaming network in menu
Help > Multicast Setup
.
• Connect the attached mains cables to the IEC connectors C14
15
.
—> The power cables are equipped with lockable C13 connectors. Re-
move the connectors by pulling back the red locking pin.
• Connect the mains cables to mains sockets with protective conductor con-
nections. Thereby note the voltage specified on the device.
—> This device has no primary power switch and is in standby mode im-
mediately after connecting the operating voltage. Power ON/OFF
8
switches only the secondary DC voltages!
For a complete disconnection from the mains, both mains plugs must
be pulled out of the mains sockets. Ensure that the mains plugs can
be pulled out without difficulties.
• Configure the device (page 15).
• If the
configuration is finished
connect the RF output
20
to the cable network.