- 10 -
STI 1916 CT
3.3 P
otential
equalisation
(Pe)
Equalise the potential (PE) in accordance with IEC/EN/DIN EN 60728.
• Connect the PE connection terminal
17
to a PE rail (supplied by customer)
using the PE wire (Cu 4 mm
2
- 9 mm
2
).
3.4 C
onneCting
the
deviCe
• Connect the MPTS input
1
to the LAN network via CAT-6 cables.
—> The device requests the required multicast IP streams via the MPTS in-
put every 60 seconds.
Querier requests will not be answered!
Keep
this in mind when configuring the network (querier host timeout).
—> Service Information
• Connect the attached mains cables to the IEC connectors C14
15
.
—> The power cables are equipped with lockable C13 connectors. Re-
move the connectors by pulling back the red locking pin.
• Connect the mains cables to a mains sockets with protective conductor con-
nections. Thereby note the voltage specified on the device.
—> This device has no primary power switch and is in standby mode im-
mediately after connecting the operating voltage. Power ON/OFF
8
switches only the secondary DC voltages!
For a complete disconnection from the mains, both mains plugs must
be pulled out of the mains sockets. Ensure that the mains plugs can
be pulled out without difficulties.
• Configure the device (page 13).
• If the
configuration is finished
connect the RF output
18
to the cable network.