Chapter 2: General Information
Elevator Guy Bracket Position
1. When possible, the elevator leg should be centered within the tower so that the wind load transmit-
ted to the tower is distributed equally between the two parallel sides of the tower.
2. If the elevator guy is outside the tower, when possible, the leg should be centered between the two
nearest columns of the tower so that the wind load is distributed to the tower equally.
Figure 2-3
Elevator guy bracket position
Anchor Washers
1. GSI specifies a diameter and grade of anchor rod.
2. GSI provides anchor washers corresponding to the recommended sizes.
Recommended Maximum Sizes for Anchor-Rod Holes in Base Plates (AISC 360–10)
Anchor Rod Diameter
(in.)
Maximum Hole Diameter
(in.)
Minimum Washer Size
(in.)
Minimum Washer Thick-
ness (in.)
3/4
1 5/16
2
1/4
7/8
1 9/16
2 1/2
5/16
1
1 13/16
3
3/8
1 1/4
2 1/16
3
1/2
1 1/2
2 5/16
3 1/2
1/2
1 3/4
2 3/4
4
5/8
2
3 1/4
5
3/4
2 1/2
3 3/4
5 1/2
7/8
16
PNEG-2115
2-Leg and 4-Leg Towers