6. Flashing Installation
Figure 6A
Grain Systems Formed Flashing Installation
If a bin sweep auger will be used, overlap flashing (D) so that the sweep will climb up on to the
next flashing (D) section when rotating (usually clockwise).
This will prevent the
rotating/slipping outer wheel of the sweep from catching on the flashing edges.
(All GSI power sweeps
and carry-in sweeps manufactured after April 2002 run clockwise.)
After floor is in place, place 1-1/4" bolts through pre-punched holes in sidewall. Bolt heads should be on
outside of bin.
to determine the correct sequence for placing the nuts and washers. Finger
tighten the nuts until all flashing is installed, then go back and fully tighten. While holding the flashing flat
and pushing in towards the bin wall, fasten the flashing (F) to the floor with two (2) sheet metal screws (E).
Figure 6B
Ref #
Description
A
Flashing
B
1-1/4" Bin Bolt
C
Sheet Metal Screw
Ref #
Description
Ref #
Description
A
Bin Bolt
D
Flashing
B
Spacer Nut
E
Sheet Metal Screw
C
Flat Washer
F
Flooring
2.66" Corrugation
4.00" Corrugation
High plenum
Low plenum