
4. Installation
20
PNEG-1894
TopDry Chute Controller
Connecting the Cable to the Turnbuckle
1. Run the cable from the inside of the bin through the sidewall sheet over the chute pulley on the bin
eave and down to the chain tunbuckle from the controller.
Figure 4I
Ref #
Part #
Description
A
TD-101335
Front Chain Guard
B
TD-101336
Rear Chain Guard
Содержание PNEG-1894
Страница 1: ...PNEG 1894 TopDry Chute Controller Installation Manual PNEG 1894 Version 5 1 Date 09 27 20...
Страница 12: ...12 PNEG 1894 TopDry Chute Controller 3 Controller Layout Figure 3A Chute Pulley Cable Location...
Страница 14: ...4 Installation 14 PNEG 1894 TopDry Chute Controller Figure 4C...
Страница 23: ...PNEG 1894 TopDry Chute Controller 23 5 Wiring and Schematic Diagrams Actuator Wiring Schematic...