4
Flashing Installation
1. If a bin sweep auger will be used, overlap flashing (13) so that the sweep with climb up on to the
next flashing (13) section when rotating (usually clockwise).
2. This will prevent the rotating/slipping outer wheel of the sweep from catching on the flashing (13)
edges.
NOTE:
All GSI power sweeps and carry-in sweeps manufactured after April 2002 run clockwise.
Figure 4-1
Formed flashing installation
13
Flashing
15
Sheet metal screw
14
1-1/4" bin bolt
16
Flat side of washer
PNEG-223
60' Cor-Lok and Cut-Lok Flooring
23
Содержание 60' DIAMETER
Страница 4: ...NOTES 4 PNEG 223 60 Cor Lok and Cut Lok Flooring...
Страница 12: ...NOTES 12 PNEG 223 60 Cor Lok and Cut Lok Flooring...
Страница 20: ...NOTES 20 PNEG 223 60 Cor Lok and Cut Lok Flooring...
Страница 22: ...NOTES 22 PNEG 223 60 Cor Lok and Cut Lok Flooring...
Страница 26: ...NOTES 26 PNEG 223 60 Cor Lok and Cut Lok Flooring...
Страница 28: ...NOTES 28 PNEG 223 60 Cor Lok and Cut Lok Flooring...
Страница 30: ...NOTES 30 PNEG 223 60 Cor Lok and Cut Lok Flooring...
Страница 42: ...NOTES 42 PNEG 223 60 Cor Lok and Cut Lok Flooring...
Страница 46: ...NOTES 46 PNEG 223 60 Cor Lok and Cut Lok Flooring...
Страница 48: ...NOTES 48 PNEG 223 60 Cor Lok and Cut Lok Flooring...